Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Road transport, highways sector has maximum number of delayed projects: Govt report

PTI
Updated: April 30th, 2023, 15:15 IST
in Business
0
National Highway

Representational image

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

New Delhi: The road transport and highways sector has the maximum number of delayed projects at 402, followed by railways at 115 and the petroleum industry at 86, showed a government report.

In the road transport and highways sector, 402 out of 749 projects are delayed.  For railways, out of 173 projects, 115 are delayed, while in the petroleum sector, 86 out of 145 projects are running behind schedule, as per the latest flash report on infrastructure projects for March 2023.

Also Read

IMF

Another jolt for Pakistan as IMF lowers GDP growth forecast to 3%

10 hours ago
EAM Jaishankar

EAM Jaishankar to begin three-day US visit today

12 hours ago

The Infrastructure and Project Monitoring Division (IPMD) is mandated to monitor central sector infrastructure projects costing Rs 150 crore and above based on the information provided on the Online Computerised Monitoring System (OCMS) by the project implementing agencies.

The IPMD comes under the Ministry of Statistics and Programme Implementation.  The report showed that the Muneerabad-Mahaboobnagar rail project is the most delayed. It is delayed by 276 months.

The second-most delayed project is the Udhampur-Srinagar-Baramulla rail project, which is delayed by 247 months.

The third-most delayed project, Belapur-Seawood-Urban Electrified Double Line, is running 228 months behind schedule.

The Flash Report for March 2023 contains information on the status of the 1,449 central sector infrastructure projects costing 150 crore and above.

As many as 821 projects are delayed, 354 reported cost overrun and 247 projects reported both time and cost overrun with respect to their original project implementation schedules.

A total of 821 projects are delayed with respect to their original schedules and 165 projects have reported additional delays vis-a-vis their date of completion reported in the previous month. Of these 165 projects, 52 are mega projects costing Rs 1,000 crore and above.

About the road transport and highways sector, report stated that the total original cost of implementation of 749 projects, when sanctioned, was of the order of Rs 4,32,893.85 crore, but this was subsequently anticipated to cost Rs 45,11,68.46 crore, implying a cost overrun of 4.2 per cent.

The expenditure incurred on these projects till March, 2023 was Rs 2,31,620.94 crore, which was 51.3 per cent of the anticipated cost of the projects.

Similarly in railways, total original cost of implementation of 173 projects, when sanctioned, was of the order of Rs 3,72,761.45 crore, but this was subsequently anticipated to Rs 6,27,160.59 crore, implying a cost overrun of 68.2 per cent.

The expenditure incurred on these projects till March, 2023 was Rs 3,84,947.64 crore, which was 61.4 per cent of the anticipated cost of the projects

About the petroleum sector, it said, total original cost of implementation of 145 projects, when sanctioned, was of the order of Rs 3,63,608.84 crore, but this was subsequently anticipated to Rs 3,84,082.25 crore, implying a cost overrun of 5.6 per cent.

The expenditure incurred on these projects till March, 2023 stood at Rs 1,52,566.01 crore, which was 39.7 per cent of the anticipated cost of the projects.

PTI

Tags: BusinesshighwaysIndiaINFRASTRUCTURE
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Kamana Singh

December 12, 2019
#MyPaperBagChallenge

Anasuya Sahoo

December 12, 2019
#MyPaperBagChallenge

Sarmistha Nayak

December 12, 2019
#MyPaperBagChallenge

Mrutyunjaya Behera

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Archana Parida

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Jhili Jena

December 12, 2019
#MyPaperBagChallenge

Archit Mohapatra

December 12, 2019
#MyPaperBagChallenge

Lopali Pattnaik

December 12, 2019
#MyPaperBagChallenge

Bijswajit Pradhan

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Debasis Mohanty

December 12, 2019
#MyPaperBagChallenge

Diptiranjan Biswal

December 12, 2019
#MyPaperBagChallenge

Jyotshna Mayee Pattnaik

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

Adyasha Priyadarsani Sendha

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Geetanjali Patro

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Aishwarya Ranjan Mohanty

December 12, 2019
#MyPaperBagChallenge

Mandakini Dakua

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019

Archives

Editorial

Missed Opportunity

Union budget
February 2, 2026

For an economy plagued by multiple ailments – a daily depreciating currency, growing household debt, high unemployment and inequality, exodus...

Read moreDetails

Lawless Law

Aakar Patel
February 1, 2026

By Aakar Patel As a democratic society, it is expected that India’s authorities follow the rule of law. This includes...

Read moreDetails

Strategic Punch

Silent Shift
January 31, 2026

By Dilip Cherian Three hours is barely enough time for a working lunch in New Delhi. Yet when UAE President...

Read moreDetails

Another Leak

January 28, 2026

Invariably US President Donald Trump says one thing and means something completely different has, by now, become clear to the...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST