Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result
EVOS

Nepal, India agree to construct 4000-KV cross border transmission line

IANS
Updated: September 10th, 2021, 16:46 IST
in National
0
Pic Courtesy: Kathmandu Post

Pic Courtesy: Kathmandu Post

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

Kathmandu: In a major boost for bilateral power trade, Nepal and India have signed an investment agreement for the construction of the second Butwal-Gorakhpur 400 KV cross-border transmission line.

A joint venture and shareholder agreement has been signed between the Nepal Electricity Authority (NEA) and the Power Grid Corporation of India Ltd, in New Delhi Thursday, according to the NEA.

Also Read

Karnataka - Siddaramaiah - DK Shivakumar

CM Siddaramaiah invites Shivakumar for breakfast to discuss on leadership row

11 hours ago

Karnataka: Caste groups, seers come out in open over leadership crisis; back CM and Dy CM

12 hours ago

The agreement was signed by NEA Managing Director Kulman Ghising and PGCIL Executive Director Y.K. Dixit.

After completing the project, Nepal, and India can easily trade around 2,000 MW of energy from this dedicated transmission line.

The proposed transmission line is a major component of the $630 million “Nepal Compact”, an agreement between the Nepal government and the US’ Millennium Challenge Corporation to fund electricity and road projects of strategic importance in Nepal.

An agreement on implementing the transmission line is also a prerequisite for the multi-million dollar MCC-Nepal compact — viewed by many in Nepal as a counter-initiative under the Indo-Pacific Strategy of the US against China’s Belt and Road Initiative — to become effective.

Nepal’s Council of Ministers has already approved the NEA’s proposal to invest 50 per cent shares in the company to be set up for the construction of the Butwal-Gorakhpur cross-border transmission line.

The signing of the agreement has paved a way for both sides to set up the joint venture company with 50 per cent share each of the NEA and the Power Grid for the construction of the section on the Indian side,as well as completing the legal procedure, Ghising said.

It will take three and half years to complete the construction of the project that will be 120 km long – around 100 km will be on the Indian side and rest on the Nepali side.

The transmission line will become a major energy lifeline between Nepal and India, NEA spokesperson Prabal Adhikari said.

A meeting of the Nepal-India Energy Joint Steering Committee had decided, in October 2019, to build the transmission line but due to the Covid pandemic, further negotiations were put on hold. The total cost of the project would be (Nepali) Rs 7 billion (Indian Rs 4 billion).

During the meeting in Delhi, the Nepali delegation also discussed selling the sale energy from Nepal to India.

Nepal is adding around 456 MW energy soon and during the rainy season, it wants to sell the spare energy to India. Nepal is also importing over 300 MW of energy from India during the winter season to meet its energy demands.

As per the power utility’s estimate, Nepal will have a surplus of around 8,000 MW by 2025 as the country’s generation capacity is expected to reach 10,924 MW while peak demand is likely to be 2,981 MW. In line with the multiple requests from Nepali authorities and the surplus power projections, India has also agreed to formalise the terms related to the energy banking mechanism which will allow Nepal and India to exchange power on a need basis.

IANS

Tags: Butwalcross border transmission lineGorakhpurIndiaIndo-Pacific StrategyKulman GhisingNEANepalNepal Electricity AuthorityPower Grid Corporation of India LtdPrabal AdhikariY.K. Dixit
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

Tabish Maaz

December 12, 2019
#MyPaperBagChallenge

Archana Parida

December 12, 2019
#MyPaperBagChallenge

Adrita Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Bijswajit Pradhan

December 12, 2019
#MyPaperBagChallenge

Manas Samanta

December 12, 2019
#MyPaperBagChallenge

Sitakanta Mohanty

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Priyabrata Mohanty

December 12, 2019
#MyPaperBagChallenge

Lopali Pattnaik

December 12, 2019
#MyPaperBagChallenge

Mrutyunjaya Behera

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Adweeti Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Sibarama Khotei

December 12, 2019
#MyPaperBagChallenge

Sarfraz Ahmad

December 12, 2019
#MyPaperBagChallenge

Faiza Firdous

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

Mandakini Dakua

December 12, 2019
#MyPaperBagChallenge

Keshab Chandra Rout

December 12, 2019
#MyPaperBagChallenge

Aishwarya Ranjan Mohanty

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Debasis Mohanty

December 12, 2019

Archives

Editorial

Mini-PMO Experiment

November 29, 2025

For three days, Naya Raipur is set to cosplay as a “mini-PMO”, complete with the full weight of India’s security...

Read moreDetails

Food For Thought

processed foods odisha
November 26, 2025

Nearly 50 experts from different countries have sounded the alarm bell for global consumption of ultra processed food (UPF) which...

Read moreDetails

Might Is Right

Donald Trump
November 25, 2025

US President Donald Trump’s peace initiatives appear to be turning into a one-sided affair in which the aggressor is being...

Read moreDetails

COP Compromise

COP30
November 24, 2025

Even after running overtime for more than 18 hours, the COP30 summit at Belém, Brazil, concluded with a compromise agreement...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST