Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

World Bank approves additional $1billion loan for China-backed hydropower project in Pakistan

PTI
Updated: June 11th, 2024, 15:28 IST
in International
0
Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

Islamabad: The World Bank has approved an additional loan of $1 billion for cash-strapped Pakistan to support the China-backed Dasu hydropower project in the restive Khyber Pakhtunkhwa province.

According to a report in the Express Tribune newspaper, this constitutes the third major financing by the global lender for the project, which earlier secured $588.4 million for preparatory works and an additional USD 700 million for constructing the transmission line to transmit electricity from the project.

Also Read

Philippines president accorded ceremonial welcome at Rashtrapati Bhavan

Philippines president accorded ceremonial welcome at Rashtrapati Bhavan

4 hours ago
We live in uncertain times, collective desire to see 'fair’ global order: EAM

We live in uncertain times, collective desire to see ‘fair’ global order: EAM

18 hours ago

The Dasu hydropower project, situated approximately 300 km north of Islamabad in the unruly Khyber Pakhtunkhwa province, is being developed by China Gezhouba with funding from the global lender and has endured at least two deadly terrorist attacks targeting Chinese nationals involved in its construction.

The World Bank in a press release Monday said it has approved $1 billion additional financing for the DASU Hydropower Stage I (DHP I) Project.

“This financing will support the expansion of hydropower electricity supply, improve access to socio-economic services for local communities, and build the Water and Power Development Authority’s (WAPDA) capacity to prepare future hydropower projects,” it said.

Najy Benhassine, World Bank Country Director for Pakistan, said the country’s energy sector suffers from multiple challenges to achieve affordable, reliable, and sustainable energy.

“The DASU Hydropower Project site is one of the best hydropower sites in the world and is a game changer for the Pakistan energy sector. With a very small footprint, the DHP will contribute to ‘greening’ the energy sector and lowering the cost of electricity,” he said in the release.

The World Bank said upon completion, the hydropower plant will have an installed capacity of 4,320–5,400 MW.

“DHP-I is an essential project in Pakistan’s efforts to reverse its dependence on fossil fuels and reach 60 per cent renewable energy by 2031,” said Rikard Liden, Task Team Leader for the project.

The additional financing will facilitate the expansion of electricity supply and potentially save Pakistan an estimated $1.8 billion annually by replacing imported fuels, and offset around 5 million tons of carbon dioxide, he said.

“The annual economic return of DHP-I is estimated to be around 28 per cent,” the press release quoted Liden as saying.

In March, a suicide attack claimed the lives of five Chinese engineers and their Pakistani driver at the project site. In July 2021, ten Chinese nationals were killed and 26 others injured in a suicide attack on a bus en route to the Dasu Hydropower Project.

Cash-strapped Pakistan provided $11.6 million in compensation to the Chinese nationals affected by the terrorist incidents.

China Gezhouba Group Company (CGGC) serves as the contractor for the Dasu Hydropower Project.

Pakistan urgently requires cheaper electricity resources to reduce reliance on expensive imported fuel-based power generation. High electricity costs have prompted households, factories, mosques, and hospitals to turn to solar power generation, increasing the burden on those still connected to the national grid, the Express Tribune newspaper reported.

PTI

Tags: ChinaHydropowerPakistanWorld Bank
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Swarit Praharaj

December 12, 2019
#MyPaperBagChallenge

Geetanjali Patro

December 12, 2019
#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Smitarani Sahoo

December 12, 2019
#MyPaperBagChallenge

Archana Parida

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Aishwarya Ranjan Mohanty

December 12, 2019
#MyPaperBagChallenge

Matrumangal Jena

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Pitabas Tripathy

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019
#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Rajashree Manasa Mohanty

December 12, 2019
#MyPaperBagChallenge

Lopali Pattnaik

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Jhili Jena

December 12, 2019
#MyPaperBagChallenge

Sarfraz Ahmad

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Tapaswini Mallick

December 12, 2019
#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Archit Mohapatra

December 12, 2019
#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Sitakanta Mohanty

December 12, 2019
#MyPaperBagChallenge

Diptiranjan Biswal

December 12, 2019
#MyPaperBagChallenge

Kamana Singh

December 12, 2019

Archives

Editorial

Unchanged Iran

Iran flag
August 5, 2025

It kind of seems stupid on the part of anyone who expects any change of attitude in the hearts of...

Read more

On The Back Foot

India-US trade
August 4, 2025

Last week, US President Donald Trump imposed a sharp 25 per cent tariff on India and an unspecified penalty for...

Read more

Rules Abandoned

Rights & Restrictions: AAKAR PATEL
August 3, 2025

The United States has 34 crore people (the size of Uttar Pradesh and Bihar). Americans represent 4 per cent of...

Read more

The CSS Crisis

August 2, 2025

The Central Secretariat Service (CSS) may not be the face of government, but it’s certainly its nervous system. And right...

Read more
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2024 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2024 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2024 All rights Reserved by OrissaPOST