Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Chandrayaan-2 launch called off due to technical glitch

IANS
Updated: July 15th, 2019, 08:24 IST
in Home News, National
0
Minutes before making this announcement, the officials put on hold the countdown for less than five minutes.

Minutes before making this announcement, the officials put on hold the countdown for less than five minutes.

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

Sriharikota (Andhra Pradesh): India’s ambitious moon landing mission Chandrayaan-2 launch was called off due to technical snag in the ‘Bahubali’ rocket Monday about one hour before it was to blast-off.

“It is not possible to make the launch within the launch window. The revised launch schedule will be announced later,” an official announced from the Mission Control Centre.

Also Read

ECI

EC transfers Patna SP, takes action against officials after Mokama violence

4 hours ago
Tri-service Exercise Trishul aims to boost integration in western sector

Tri-service Exercise Trishul aims to boost integration in western sector

4 hours ago

Minutes before making this announcement, the officials put on hold the countdown for less than five minutes.

“The technical snag was noticed. We first have to approach the vehicle to assess the problem. First we have to empty the fuel loaded in the rocket, then the rocket will be taken back for further investigation,” an ISRO official said.

“This process will take 10 days after that only we can decide on the launch schedule,” he added.

The launch was called off nearly one hour before the actual time of launch which was 2.51 a.m.

“A technical snag was observed in launch vehicle system at T-56 minute. As a measure of abundant precaution, #Chandrayaan2 launch has been called off for today. Revised launch date will be announced later,” ISRO tweeted later.

Standing at about 44 metre tall, the 640-tonne rocket Geosynchronous Satellite Launch Vehicle-Mark III (GSLV-Mk III) is nicknamed ‘Bahubali’. And just like the hero in the hit film by the same name lifted a heavy ‘lingam’, the rocket will carry the 3.8 tonne Chandrayaan-2 spacecraft.

The Rs 978 crore Chandrayaan-2 mission was prestigious one as it aimed to make India as the fourth nation in the world to land and ride on the moon.

The other three nations that had achieved this feat are Russia, the US and China.

The Chandrayaan-2 consists of three segments – the Orbiter (weighing 2,379 kg, eight payloads), the lander-Vikram (1,471 kg, four payloads) and rover Pragyan (27 kg, two payloads).

The GSLV-Mk III with a capacity to carry four ton satellite, is a three stage/engine rocket with two strap-on motors powered by solid fuel. The second stage is a core liquid fuel booster and the third is the cryogenic engine.

To date ISRO has sent up three GSLV-Mk III rockets. The first one was on 18.12.2014 carrying Crew Module Atmospheric Reentry Experiment (3.7 ton). The mission was also to test the rocket’s inflight structural stability.

The second and third GSLV-Mk III’s went up on 5.6.2017 and 14.11.2018 carrying communication satellites GSAT-19 (3.1 ton) and GSAT-29 (3.4 ton) respectively.

Interestingly, GSLV-Mk III will be used for India’s manned space mission slated in 2022.

India presently has two fully operational rockets — the Polar Satellite Launch Vehicle (PSLV) and GSLV-Mk II — with a lift-off mass of 415 ton and a carrying capacity of 2.5 tonnes.

IANS

Tags: BahubaliChandraayan-2ISRO
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Archit Mohapatra

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Diptiranjan Biswal

December 12, 2019
#MyPaperBagChallenge

Pragyan Priyambada

December 12, 2019
#MyPaperBagChallenge

Priyabrata Mohanty

December 12, 2019
#MyPaperBagChallenge

Keshab Chandra Rout

December 12, 2019
#MyPaperBagChallenge

Matrumangal Jena

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Adweeti Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Rajashree Manasa Mohanty

December 12, 2019
#MyPaperBagChallenge

Pitabas Tripathy

December 12, 2019
#MyPaperBagChallenge

Smitarani Sahoo

December 12, 2019
#MyPaperBagChallenge

Jhili Jena

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Archana Parida

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019
#MyPaperBagChallenge

Sarfraz Ahmad

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019

Archives

Editorial

Bleeding Talent

Power of Continuity
November 1, 2025

Syed Ali Murtaza Rizvi’s decision to hang up his boots eight years ahead of time has clearly rattled the Telangana...

Read moreDetails

The Global Polytunity

October 31, 2025

By Yuen Yuen Ang Conflicts, trade wars, inequality, and democratic decay fill today’s headlines. Each crisis appears to be feeding...

Read moreDetails

Why Authoritarians Thrive

Senem Aydın-Düzgit
October 30, 2025

By Senem Aydın-Düzgit US President Donald Trump’s ferocious assault on American institutions over the last nine months is a particularly...

Read moreDetails

Weaponising SIR

Election Commission of India
October 29, 2025

The existence of bogus voters in the electoral rolls prepared by the Election Commission of India (ECI) has always been...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST