Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Talcher Fertilizer Plant construction work running behind schedule in Odisha

PTI
Updated: December 5th, 2023, 16:29 IST
in Business, State, Top Stories
0
Talcher fertilizer plant   
Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

New Delhi/ Talcher: The construction work of the country’s first-ever coal gasification-based Talcher Fertilizer Plant in Odisha is running behind schedule and is likely to be completed by September next year, Parliament was informed Tuesday.

The delay has been caused due to the restrictions imposed during the outbreak of Covid-19, Minister of State for Chemicals and Fertilisers Bhagwanth Khuba said in a written reply to the Rajya Sabha.

Also Read

Odisha’s per capita debt burden at Rs 26,037.70: CM Majhi

8 hours ago
Odisha floods: Brahmani, Baitarani breach danger marks in different parts; Mahanadi basin floods

Odisha: Five districts in flood grip

8 hours ago

Accordingly, the Board of Talcher Fertilizer Ltd has revised the likely date of completion to September 2024, he said, adding that the project has so far incurred an expenditure of Rs 4,200 crore.

“The major reason for the delay in construction work of Talcher Fertilizer Ltd (TFL) project is the spread of Covid-19 and related contextual issues (travel restrictions, etc),” Khuba said.

TFL was awarded Lump Sum Turnkey (LSTK) contract for coal gasification and ammonia urea packages in September 2019 and a few months later, Covid-19 started spreading across the globe, including India, he said.

The entire country was put under a prolonged lockdown, leading to delay in initial engineering work for the project. Later, first and second waves of Covid-19 pandemic struck India, which also lead to delayed work at Talcher site, he said.

“Due to the above restrictions, placement of orders for the project items were also delayed,” the minister added.

According to Khuba, the project has received all major clearances, including environment clearance and even the coal ministry has allocated a long-term coal linkage. Erection of the coal gasifier has started at the site.

All major equipment, except urea reactor, have been received at the site for the ammonia urea plant, he said.

Construction of two Chimneys out of three is complete and one boiler drum has been erected at the site, he said, adding that equipment erection is in progress.

PTI

Tags: AngulOdishaTalcher fertilizer plant
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019
#MyPaperBagChallenge

Jyotshna Mayee Pattnaik

December 12, 2019
#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Akshaya Kumar Dash

December 12, 2019
#MyPaperBagChallenge

Matrumangal Jena

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
#MyPaperBagChallenge

Rajashree Manasa Mohanty

December 12, 2019
#MyPaperBagChallenge

Sarmistha Nayak

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Anasuya Sahoo

December 12, 2019
#MyPaperBagChallenge

Adyasha Priyadarsani Sendha

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Debasis Mohanty

December 12, 2019
#MyPaperBagChallenge

Tapaswini Mallick

December 12, 2019
#MyPaperBagChallenge

Keshab Chandra Rout

December 12, 2019
#MyPaperBagChallenge

Vandana Singh

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019
#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

Tabish Maaz

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019

Archives

Editorial

Trust Deficit for EC

Election Commission of India
September 28, 2026

After remaining deafeningly silent on a media report casting serious doubts about the fairness and functioning of the Election Commission...

Read moreDetails

The Rot Within

Aakar Patel
September 27, 2026

By Aakar Patel Corruption and bribery are two words that are interchangeable. Or are they? Bribery, in the way that...

Read moreDetails

The Dashboard Raj

September 26, 2026

By Dilip Cherian The next big change in India’s babudom may not come through another cadre reform or a new...

Read moreDetails

Let them Bloom

September 23, 2026

The alleged suicide by a second-year B. Tech student of the prestigious IIT Bombay, one of India’s most premier institutes,...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST