Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Japan’s Fukushima nuclear plant begins releasing treated radioactive wastewater into Pacific Ocean 

AP
Updated: August 24th, 2023, 13:54 IST
in International
0
Japan's Fukushima nuclear plant begins releasing treated radioactive wastewater into Pacific Ocean 

REUTERS/Issei Kato/File Photo

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

Okuma: The tsunami-wrecked Fukushima Daiichi nuclear power plant ‘s operator says it began releasing its first batch of treated radioactive water into the Pacific Ocean Thursday — a controversial step, but a milestone for Japan’s battle with the growing radioactive water stockpile.

In a live video from a control room at the plant, Tokyo Electric Power Company Holdings showed a staff member turn on a seawater pump with a click of a mouse, marking the beginning of the controversial project that is expected to last for decades.

Also Read

Indus Water Treaty

Pakistan urges India to resume normal functioning of Indus Waters Treaty

7 hours ago
Odisha Police detain 18 suspected Bangladeshi nationals in Kendrapara

Odisha Police detain 18 suspected Bangladeshi nationals in Kendrapara

7 hours ago

“Seawater Pump A activated,” the main operator said, confirming the release was underway. TEPCO later confirmed that the seawater pump was activated at 1:03pm (0403 GMT), three minutes after the final step began.

TEPCO said an additional wastewater release pump was activated 20 minutes after the first. Plant officials said everything was moving smoothly so far.

Japanese fisher groups have opposed the plan for fear it will further damage the reputation of their seafood. Groups in China and South Korea have also raised concerns, making it a political and diplomatic issue.

But the Japanese government and TEPCO say the water must be released to make room for the plant’s decommissioning and to prevent accidental leaks. They say the treatment and dilution will make the wastewater safer than international standards and its environmental impact will be negligibly small.

Tony Hooker, director of the Center for Radiation Research, Education, Innovation at the University of Adelaide, said the water released from the Fukushima plant is safe. “It certainly is well below the World Health Organization drinking water guidelines,” he said. “It’s safe.”

“It’s a very political issue of disposing radiation into the sea,” he said. “I understand people’s concerns and that’s because we as scientists have not explained it in a very good way, and we need to do more education.”

Still, some scientists say the long-term impact of the low-dose radioactivity that remains in the water needs attention.

In a statement Thursday, International Atomic Energy Agency Director General Rafael Mariano Grossi said, “IAEA experts are there on the ground to serve as the eyes of the international community and ensure that the discharge is being carried out as planned consistent with IAEA safety standards.”

The United Nations agency also said it would launch a webpage to provide live data about the discharge, and repeated its assurance that the IAEA would have an on-site presence for the duration of the release.

The water release begins more than 12 years after the March 2011 nuclear meltdowns, caused by a massive earthquake and tsunami. It marks a milestone for the plant’s battle with an ever-growing radioactive water stockpile that TEPCO and the government say has hampered the daunting task of removing the fatally toxic melted debris from the reactors.

The pump activated Thursday afternoon sent the first batch of the diluted, treated water from a mixing pool to a secondary pool 10 minutes later. It then moves through a connected undersea tunnel to go out 1 kilometer (0.6 miles) off the coast. Officials said the water moves at a walking speed and will take about 30 minutes to exit from the tunnel.

The operator checked data and the progress on a set of four monitors that show the water volume, pump conditions and any alerts.

TEPCO executive Junichi Matsumoto said Thursday’s release was planned to start small in order to ensure safety.

The wastewater is collected and partly recycled as cooling water after treatment, with the rest stored in around 1,000 tanks, which are already filled to 98% of their 1.37-million-ton capacity. Those tanks, which cover much of the plant complex, must be freed up to build the new facilities needed for the decommissioning process, officials said.

Final preparation for the release began Tuesday, when just one ton of treated water was sent from a tank for dilution with 1,200 tons of seawater, and the mixture was kept in the primary pool for two days for final sampling to ensure safety, Matsumoto said. A batch of 460 tons was to be sent to the mixing pool Thursday for the actual discharge.

Fukushima’s fisheries, tourism and economy — which are still recovering from the disaster — worry the release could be the beginning of a new hardship.

Fukushima’s current fish catch is only about one-fifth its pre-disaster level, in part due to a decline in the fishing population. China has tightened radiation testing on Japanese products from Fukushima and nine other prefectures, halting exports at customs for weeks, Fisheries Agency officials said.

Prime Minister Fumio Kishida said the release is indispensable and could not be postponed. He noted an experimental removal of a small amount of the melted debris from the No 2 reactor is set for later this year using a remote-controlled giant robotic arm.

In 2021, the Japanese government announced plans to release the treated water to the sea. Then, on Sunday, Kishida made a rushed visit to the plant before meeting with fisheries representatives and pledging to support their livelihoods until the release ends.

The hurried timeline raised skepticism that it was made to fit Kishida’s busy political schedule in September. But Economy and Industry Ministry officials say they wanted the release to start as early as possible and have good safety records ahead of the fall fishing season.

The March 2011 earthquake and tsunami destroyed the plant’s cooling systems, causing three reactors to melt. Highly contaminated cooling water applied to the damaged reactors has leaked continuously to building basements and mixed with groundwater.

TEPCO plans to release 31,200 tons of the treated water by the end of March 2024, which would empty only 10 tanks because of the contaminated production of wastewater at the plant, though the pace will later pick up.

AP

Tags: FukushimaFumio KishidaIAEAInternational Atomic Energy AgencyJapanTEPCO
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Akshaya Kumar Dash

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

Smitarani Sahoo

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Pratyasharani Ghibela

December 12, 2019
#MyPaperBagChallenge

Debasis Mohanty

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
#MyPaperBagChallenge

Tapaswini Mallick

December 12, 2019
#MyPaperBagChallenge

Manas Samanta

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Vandana Singh

December 12, 2019
#MyPaperBagChallenge

Faiza Firdous

December 12, 2019
#MyPaperBagChallenge

D Rama Rao

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Pitabas Tripathy

December 12, 2019
#MyPaperBagChallenge

Sibarama Khotei

December 12, 2019
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
#MyPaperBagChallenge

Dibya Ranjan Das

December 12, 2019
#MyPaperBagChallenge

Geetanjali Patro

December 12, 2019
#MyPaperBagChallenge

Lopali Pattnaik

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Pragyan Priyambada

December 12, 2019
#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Jyotshna Mayee Pattnaik

December 12, 2019

Archives

Editorial

Proof To Vote

Vote
June 30, 2025

Months ahead of the Assembly polls in Bihar, the Election Commission of India (ECI) on 28 June launched a ‘special...

Read more

Genesis of Jana Sangh

AAKAR PATEL
June 29, 2025

We marked the 50th anniversary of the Emergency a few days ago. Another anniversary, this time the 75th, went relatively...

Read more

Double-engine PMO

June 28, 2025

Since February, the Prime Minister’s Office (PMO) has been operating for the first time with two full principal secretaries, P.K....

Read more

Let Them Be

NEET
June 25, 2025

A17-year-old girl was beaten to death by her father for not getting good score in a mock test for the...

Read more
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2024 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2024 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2024 All rights Reserved by OrissaPOST