Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Japan’s nuclear safety agency orders power plant operator to study the impact of Jan 1 quake

AP
Updated: January 10th, 2024, 20:51 IST
in International
0
Japan's Fukushima nuclear plant begins releasing treated radioactive wastewater into Pacific Ocean 

REUTERS/Issei Kato/File Photo

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

Tokyo: Japan’s nuclear safety regulators have told the operator of a nuclear power plant in the area hit by a powerful New Year’s Day quake to study its potential impact.

The Nuclear Regulation Authority, or NRA, asked for further investigation even though initial assessments showed the Shika nuclear power plant’s cooling systems and ability to contain radiation remained intact.

Also Read

UK-Israel

Judges dismiss case accusing UK of illegal arms sales to Israel

2 mins ago
Asian stock market

World shares mixed after US stocks hit all-time high

53 mins ago

The order reflects Japan’s greater vigilance about safety risks after meltdowns in 2011 at a plant in Fukushima, on the northeastern Pacific coast, following a magnitude 9 quake and a massive tsunami.

The January 1 magnitude 7.6 quake and dozens of strong aftershocks have left 206 people dead and dozens more unaccounted for. It also caused small tsunami. But Hokuriku Electric Power Co., the plant’s operator, reported it had successfully dealt with damage to transformers, temporary outages, and sloshing of spent fuel cooling pools that followed the quakes.

Chief Cabinet Secretary Yoshimasa Hayashi emphasised that the plant was safe. Eighteen of 116 radiation monitoring posts installed in Ishikawa prefecture, where Shika is located, and in neighbouring Toyama briefly failed after the quake. All but two have since been repaired and none showed any abnormality, he said.

Shika is a town on the western coast of the Noto peninsula, where the quake did the most damage, leaving roads gaping, toppling and collapsing buildings, and triggering landslides.

Hokuriku Electric Power Co., reported that water had spilled from the spent fuel pools in both reactors.                 Transformers in both reactors were damaged and leaked oil, causing a temporary loss of power in one of the cooling pools. Company officials reported no further safety problems at the Nuclear Regulatory Administration’s weekly meeting Wednesday.

But NRA officials said the utility should consider a possibility of fresh damage to transformers and other key equipment as aftershocks continue.

NRA chairperson Shinsuke Yamanaka urged the utility to thoroughly investigate the cause of the transformer damage and promptly report its findings. They also were instructed to study if earthquake responses at the plant should be a reevaluated.

The Shika reactors were inaugurated in 1993 and 2006. They have been offline since the 2011 disaster. Hokuriku Electric applied to restart the newer No. 2 reactor in 2014, but safety checks by the nuclear safety agency were delayed due to the need to determine if there were active faults near the plant. The nuclear officials concluded active faults in the area were not underneath the reactors.

Hokuriku still hopes to restart the No. 2 reactor by 2026.

Both the government and business leaders generally support restarting the many reactors that were idled for safety checks and upgrades after the Fukushima disaster.

The head of Japan’s powerful business organisation Keidanren, Masakazu Tokura, visited the Shika plant last year. But Tuesday he urged the utility to be fully transparent and ensure it was safe.

“Many people are concerned, and I hope (the utility) provides adequate information at an appropriate time,” Tokura said.

AP

Tags: EarthquakeJapanNuclear power plantNuclear Regulation Authority
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Anasuya Sahoo

December 12, 2019
#MyPaperBagChallenge

Bijswajit Pradhan

December 12, 2019
#MyPaperBagChallenge

Sitakanta Mohanty

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019
#MyPaperBagChallenge

Mandakini Dakua

December 12, 2019
#MyPaperBagChallenge

Smitarani Sahoo

December 12, 2019
#MyPaperBagChallenge

Swarit Praharaj

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
#MyPaperBagChallenge

Adyasha Priyadarsani Sendha

December 12, 2019
#MyPaperBagChallenge

D Rama Rao

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Adweeti Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Chinmay Kumar Routray

December 12, 2019
#MyPaperBagChallenge

Debasis Mohanty

December 12, 2019
#MyPaperBagChallenge

Narendra Kumar

December 12, 2019
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
#MyPaperBagChallenge

Dibya Ranjan Das

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Mrutyunjaya Behera

December 12, 2019
#MyPaperBagChallenge

Pratyasharani Ghibela

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Kamana Singh

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Manas Samanta

December 12, 2019
#MyPaperBagChallenge

Pragyan Priyambada

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Sibarama Khotei

December 12, 2019

Archives

Editorial

Proof To Vote

Vote
June 30, 2025

Months ahead of the Assembly polls in Bihar, the Election Commission of India (ECI) on 28 June launched a ‘special...

Read more

Genesis of Jana Sangh

AAKAR PATEL
June 29, 2025

We marked the 50th anniversary of the Emergency a few days ago. Another anniversary, this time the 75th, went relatively...

Read more

Double-engine PMO

June 28, 2025

Since February, the Prime Minister’s Office (PMO) has been operating for the first time with two full principal secretaries, P.K....

Read more

Let Them Be

NEET
June 25, 2025

A17-year-old girl was beaten to death by her father for not getting good score in a mock test for the...

Read more
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2024 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2024 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2024 All rights Reserved by OrissaPOST