Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Silkyara & audit of tunnels: Lessons at what price

Post News Network
Updated: November 30th, 2023, 08:57 IST
in Metro, Top Stories
0
Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

Bhubaneswar: Soon after 41 workers were pulled out of the partially collapsed Silkyara tunnel in Uttarkashi Tuesday night, Union Road Transport and Highways Minister Nitin Gadkari said the accident had taught a lot and safety audit of all tunnels in the country would commence soon. He also admitted that it was very tough to work in the Himalayas and new solutions would have to be found. This would essentially mean the government’s earlier decision to expedite the 900 km Char Dham Pariyojana (project) in Uttarakhand that aims to improve connectivity to the religious pilgrimage sites of Gangotri, Yamnotri, Kedarnath, and Badrinath was not only disingenuous but it also lacked proper ground assessment. The safety aspects were thrown to the wind – despite red flags raised by geologists, environmentalists, and locals – in an apparent rush to complete the project before the approaching Parliamentary elections.

Moreover, the environment impact assessment (EIA) in the fragile Himalayan ecosystem was tweaked by dividing the project into 53 divisions (any proposed highway running beyond 100km needs environmental clearance), thus obtaining a go-ahead from the Supreme Court on the pretext of ‘national security’.

Also Read

Rath Yatra outing turns fatal as man kills wife over missing Rs500 in Rourkela

Rath Yatra outing turns fatal as man kills wife over missing Rs500 in Rourkela

7 hours ago
IMD Monsoon rain Bhubaneswar

Fishermen warned, heavy rain forecast in Odisha as low pressure builds in Bay of Bengal

7 hours ago

Just about a month earlier, the collapse of a massive under-construction dam in Sikkim had come as a wake-up call for the government and planners about the collaterals people have to pay for an ill-conceived and reckless infrastructural project. The outcome of the tunnel audit notwithstanding, the fact remains that escape routes in any long tunnel (Silkyara is 4.5 km long) to facilitate rescue work in case of emergencies is a norm everywhere in the world.

The Silkyara experience exposed the paucity of such features when the stranded labourers had to be pulled out manually using the outlawed ‘rat hole’ technique. This method, often used by coal mine plunderers in the North-East, was banned by the National Green Tribunal in 2014 as it is not only ‘unscientific’ but it also causes serious environmental degradation.

Geologists say that firms and agencies carrying out tunneling work in India seldom follow the prescribed safety concerns. They also tend to overlook the construction norms and design philosophy of the New Australian Tunnelling Method, which mandates escape routes in long tunnels that come in handy during disasters and emergencies – for workers during construction and motorists/users as well, later on.

Finally, clarity, transparency, and effective stock-taking should be maintained in such projects – from conception, and execution to completion. However, in the case of the Silkyara project, many of these aspects were found wanting.

Officials of the Bernard Gruppe, a Europe-based firm that provided design support to Navyug Construction, the agency engaged in the construction of the Silkyara-Barkot project, was quoted as saying that the geological conditions proved to be more challenging than predicted in the tender documents from the very start of the tunnel driving.

DEBASISH PANIGRAHI, OP

Tags: Char Dham PariyojanaNitin GadkariSilkyara project
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Archana Parida

December 12, 2019
#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Mandakini Dakua

December 12, 2019
#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Archit Mohapatra

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
#MyPaperBagChallenge

Dibya Ranjan Das

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Pitabas Tripathy

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Diptiranjan Biswal

December 12, 2019
#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

Geetanjali Patro

December 12, 2019
#MyPaperBagChallenge

Shreyanshu Bal

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Tapaswini Mallick

December 12, 2019
#MyPaperBagChallenge

Matrumangal Jena

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Sarfraz Ahmad

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Priyabrata Mohanty

December 12, 2019
#MyPaperBagChallenge

Chinmay Kumar Routray

December 12, 2019
#MyPaperBagChallenge

Smitarani Sahoo

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Vandana Singh

December 12, 2019

Archives

Editorial

Double-engine PMO

June 28, 2025

Since February, the Prime Minister’s Office (PMO) has been operating for the first time with two full principal secretaries, P.K....

Read more

Let Them Be

NEET
June 25, 2025

A17-year-old girl was beaten to death by her father for not getting good score in a mock test for the...

Read more

Talking Shop

G7 summit in Alberta
June 24, 2025

Normally, negatives do not make headlines. But, at times, they do. The recently concluded G7 summit in Alberta, Canada, turned...

Read more

Unending War

US-Iran
June 23, 2025

Last week, when a reporter asked US President Donald Trump whether America would enter the war on Iran with close...

Read more
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2024 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2024 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2024 All rights Reserved by OrissaPOST