Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Telengana NTPC plant allotted Mandakini- B coal block for 4,000MW plant

Post News Network
Updated: September 18th, 2020, 10:08 IST
in Metro, Top Stories
0
Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

Bhubaneswar: The Ministry of Coal has allocated Mandakini-B coal mine in Odisha’s Angul district to the National Thermal Power Corporation (NTPC). The block, which has extractable reserves of 1.2 billion tonne of coal, will fuel the public sector firm’s first 4,000MW power plant in Telangana. The project, one of the largest to be taken up by the state-owned thermal power giant, is estimated to cost Rs 20,000 crore. The plant is located at Ramagundam in Telangana’s Karimnagar district.

During the question-hour session Wednesday in the Parliament, the Coal Minister Prahlad Joshi told TRS MP G Ranjith Reddy that a tapering linkage has been accorded to the phase-1 of 1,600-MW NTPC at Ramagundam.

Also Read

OP Pic

Odisha: Luna River’s dipping water level worrisome

1 hour ago
OP Pic

Odisha: Tourists disappointed over lack of facilities at Punjisil waterfall

1 hour ago

The Union Minister said he has requested the Odisha Government to provide coal linkage of 20 million tonne per annum for NTPC’s 4,000-MW plant.

Notably, NTPC’s cumulative installed capacity is 45,548MW. The company has made the single largest thermal capacity addition (8,445MW) in India during the 12th Plan and is likely to exceed the target of 11,920MW set by the Government of India, the company said in a statement.

PNN

Tags: Mandakini-B Coal minesNTPCOdishaRamagundamTelengana NTPC plant
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Sitakanta Mohanty

December 12, 2019
#MyPaperBagChallenge

Adrita Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Pratyasharani Ghibela

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019
#MyPaperBagChallenge

Matrumangal Jena

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Manas Samanta

December 12, 2019
#MyPaperBagChallenge

Tapaswini Mallick

December 12, 2019
#MyPaperBagChallenge

Rajashree Manasa Mohanty

December 12, 2019
#MyPaperBagChallenge

Lopali Pattnaik

December 12, 2019
#MyPaperBagChallenge

Kamana Singh

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Pitabas Tripathy

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Debasis Mohanty

December 12, 2019
#MyPaperBagChallenge

Smitarani Sahoo

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Anasuya Sahoo

December 12, 2019
#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Faiza Firdous

December 12, 2019
#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Sarmistha Nayak

December 12, 2019
#MyPaperBagChallenge

Jyotshna Mayee Pattnaik

December 12, 2019
#MyPaperBagChallenge

Swarit Praharaj

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Aishwarya Ranjan Mohanty

December 12, 2019

Archives

Editorial

Rushed Laws

December 21, 2025

On December 17, Wayanad MP Priyanka Gandhi Vadra asked the Lok Sabha to send the Viksit Bharat - Guarantee For...

Read moreDetails

Strategic Recalibration

December 20, 2025

By Dilip Cherian When India quietly decided to send Rahul Rasgotra to Port Louis as National Security Advisor (NSA), it...

Read moreDetails

G Ram G

December 17, 2025

The BJP-led NDA government’s proposed change in the nomenclature of the Centre’s flagship social welfare scheme for the poor, the...

Read moreDetails

Jail Diary

December 16, 2025

It is not a bad idea, it appears, if top-notch politicians get incarcerated, at least for some days, so as...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST