Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Japanese experts to assist Indian architects develop bullet train stations

Updated: October 14th, 2018, 15:51 IST
in National
0
Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

New Delhi: Japanese consultants will join hands with Indian architects to develop the 12 proposed bullet train stations and its adjoining areas in an integrated way.

In a meeting with senior officials of Mumbai Metropolitan Region Development Authority and Gujarat’s Urban Development and Municipal Commissioners, it was decided to take the help of Japanese experts in developing the areas around the stations — connecting them to bus, metro and other forms of transportation, a senior Indian Railways official in the know told IANS.

Also Read

Won’t appear in person or through lawyer: Kejriwal writes to Delhi HC Justice Swarana Kanta Sharma

5 hours ago
Lawrence of Punjab

Delhi HC closes Bishnoi plea on ‘Lawrence of Punjab’ release

5 hours ago

The 12 proposed stations on the Mumbai-Ahmedabad high speed train route are: Bandra Kurla Complex, Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Baroda, Anand, Sabarmati and Ahmedabad.

Railways will adopt a “transit-oriented development plan” for all these stations so that each becomes a commercial hub ensuring smooth connectivity with the outside world.

In urban planning, transit-oriented development is a type of urban development that maximises the amount of residential, business and leisure space within walking distance of public transport.

“There will be scope of constructing housing complexes near some stations as per the plan,” the Railways official added.

The terminal building, which will have space for commercial activities like eateries, forex counters, malls and parking lots, will also be a major interchange hub, providing passengers seamless connectivity between the bullet train network and other services such as the metro and bus services, as well as last-mile connectivity.

“Unless the stations are well-connected with neighbouring districts, the bullet train service will not attract the ridership required to make the project viable,” said the official.

The bullet trains are expected to run at 350 km per hour covering the 508 km stretch in about two hours. In comparison, trains currently plying on the route take over seven hours to travel the distance, whereas flights take about an hour.

Railways will have two distinct schedules for the bullet trains. The faster route will stop at fewer intermediary stations, which will include Surat and Vadodara, before reaching Ahmedabad, while the other will stop at all stations.

The development of 12 stations and its adjoining areas is expected to be a boon for economic activity in the region.

The cost of the ambitious project is estimated to be Rs 1,10,000 crore and Japan is providing a soft loan worth Rs 88,000 crore at 0.1 per cent.

The 508-km high speed train corridor between Mumbai and Ahmedabad is expected to be operational by August 2022.

IANS

Tags: bullet train
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
#MyPaperBagChallenge

Dibya Ranjan Das

December 12, 2019
#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Anasuya Sahoo

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019
#MyPaperBagChallenge

Swarit Praharaj

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019
#MyPaperBagChallenge

Sitakanta Mohanty

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
#MyPaperBagChallenge

Priyabrata Mohanty

December 12, 2019
#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Rajashree Manasa Mohanty

December 12, 2019
#MyPaperBagChallenge

Narendra Kumar

December 12, 2019
#MyPaperBagChallenge

Adweeti Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Sarfraz Ahmad

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

D Rama Rao

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Mandakini Dakua

December 12, 2019
#MyPaperBagChallenge

Mrutyunjaya Behera

December 12, 2019
#MyPaperBagChallenge

Vandana Singh

December 12, 2019
#MyPaperBagChallenge

Adyasha Priyadarsani Sendha

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Geetanjali Patro

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Archit Mohapatra

December 12, 2019
#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019

Archives

Editorial

Economic Shocks

Indian Economy
April 27, 2026

The latest projections by the International Monetary Fund (IMF) offer a sobering snapshot of India’s economic trajectory. As per IMF...

Read moreDetails

Exclusion Doctrine

Rights & Restrictions: AAKAR PATEL
April 26, 2026

Aakar Patel A story under this headline was reported this month: ‘No Muslim name finds place in BJP’s Bengal list’....

Read moreDetails

Silent Recalibration

Dilip Cherian
April 25, 2026

By Dilip Cherian The Centre’s latest appointment of 48 babus at the joint secretary level across ministries looks routine on...

Read moreDetails

War-torn Economy

Oil shortfall
April 22, 2026

The disruption in the supply of cooking gas (LPG) and petrol is one aspect of the economic crisis caused by...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST