Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Road transport, highways sector has maximum number of delayed projects: Govt report

PTI
Updated: April 30th, 2023, 15:15 IST
in Business
0
National Highway

Representational image

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

New Delhi: The road transport and highways sector has the maximum number of delayed projects at 402, followed by railways at 115 and the petroleum industry at 86, showed a government report.

In the road transport and highways sector, 402 out of 749 projects are delayed.  For railways, out of 173 projects, 115 are delayed, while in the petroleum sector, 86 out of 145 projects are running behind schedule, as per the latest flash report on infrastructure projects for March 2023.

Also Read

Photo Credit: Britannica

Pentagon: India, US to sign 10-year defense framework

1 day ago
Microsoft AI

Microsoft plans 9,000 more job cuts; fourth layoff this year

2 days ago

The Infrastructure and Project Monitoring Division (IPMD) is mandated to monitor central sector infrastructure projects costing Rs 150 crore and above based on the information provided on the Online Computerised Monitoring System (OCMS) by the project implementing agencies.

The IPMD comes under the Ministry of Statistics and Programme Implementation.  The report showed that the Muneerabad-Mahaboobnagar rail project is the most delayed. It is delayed by 276 months.

The second-most delayed project is the Udhampur-Srinagar-Baramulla rail project, which is delayed by 247 months.

The third-most delayed project, Belapur-Seawood-Urban Electrified Double Line, is running 228 months behind schedule.

The Flash Report for March 2023 contains information on the status of the 1,449 central sector infrastructure projects costing 150 crore and above.

As many as 821 projects are delayed, 354 reported cost overrun and 247 projects reported both time and cost overrun with respect to their original project implementation schedules.

A total of 821 projects are delayed with respect to their original schedules and 165 projects have reported additional delays vis-a-vis their date of completion reported in the previous month. Of these 165 projects, 52 are mega projects costing Rs 1,000 crore and above.

About the road transport and highways sector, report stated that the total original cost of implementation of 749 projects, when sanctioned, was of the order of Rs 4,32,893.85 crore, but this was subsequently anticipated to cost Rs 45,11,68.46 crore, implying a cost overrun of 4.2 per cent.

The expenditure incurred on these projects till March, 2023 was Rs 2,31,620.94 crore, which was 51.3 per cent of the anticipated cost of the projects.

Similarly in railways, total original cost of implementation of 173 projects, when sanctioned, was of the order of Rs 3,72,761.45 crore, but this was subsequently anticipated to Rs 6,27,160.59 crore, implying a cost overrun of 68.2 per cent.

The expenditure incurred on these projects till March, 2023 was Rs 3,84,947.64 crore, which was 61.4 per cent of the anticipated cost of the projects

About the petroleum sector, it said, total original cost of implementation of 145 projects, when sanctioned, was of the order of Rs 3,63,608.84 crore, but this was subsequently anticipated to Rs 3,84,082.25 crore, implying a cost overrun of 5.6 per cent.

The expenditure incurred on these projects till March, 2023 stood at Rs 1,52,566.01 crore, which was 39.7 per cent of the anticipated cost of the projects.

PTI

Tags: BusinesshighwaysIndiaINFRASTRUCTURE
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Swarit Praharaj

December 12, 2019
#MyPaperBagChallenge

Jyotshna Mayee Pattnaik

December 12, 2019
#MyPaperBagChallenge

Aishwarya Ranjan Mohanty

December 12, 2019
#MyPaperBagChallenge

Matrumangal Jena

December 12, 2019
#MyPaperBagChallenge

Lopali Pattnaik

December 12, 2019
#MyPaperBagChallenge

Akshaya Kumar Dash

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
#MyPaperBagChallenge

Sarmistha Nayak

December 12, 2019
#MyPaperBagChallenge

Pitabas Tripathy

December 12, 2019
#MyPaperBagChallenge

Geetanjali Patro

December 12, 2019
#MyPaperBagChallenge

Pratyasharani Ghibela

December 12, 2019
#MyPaperBagChallenge

Faiza Firdous

December 12, 2019
#MyPaperBagChallenge

Manas Samanta

December 12, 2019
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
#MyPaperBagChallenge

Dibya Ranjan Das

December 12, 2019
#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Anasuya Sahoo

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Smitarani Sahoo

December 12, 2019
#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Archana Parida

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Narendra Kumar

December 12, 2019
#MyPaperBagChallenge

Diptiranjan Biswal

December 12, 2019
#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

Adrita Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Jhili Jena

December 12, 2019
#MyPaperBagChallenge

Sarfraz Ahmad

December 12, 2019
#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019

Archives

Editorial

Hungary Lessons

Hungary
July 2, 2025

Revolting against oppression and seeking freedom is ingrained in human nature, something that a repressive regime finds out sooner or...

Read more

New Democratic Face

Zohran Mamdani
July 1, 2025

US President Donald Trump, who had comfortably defeated his Democratic rival Kamala Harris in the recent presidential election and exuded...

Read more

Proof To Vote

Vote
June 30, 2025

Months ahead of the Assembly polls in Bihar, the Election Commission of India (ECI) on 28 June launched a ‘special...

Read more

Genesis of Jana Sangh

AAKAR PATEL
June 29, 2025

We marked the 50th anniversary of the Emergency a few days ago. Another anniversary, this time the 75th, went relatively...

Read more
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2024 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2024 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2024 All rights Reserved by OrissaPOST