Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Delhi Metro expansion: Cabinet clears Rs 12,015 crore across 13 new stations

IANS
Updated: December 24th, 2025, 16:36 IST
in National
0
Union Cabinet

Pic-IANS

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

New Delhi:  The Union Cabinet, chaired by Prime Minister Narendra Modi, Wednesday approved a Rs 12,015 crore project to expand Delhi Metro Phase V (A) to cover another 13 stations across three new corridors, spanning 16 kilometres.

Three new corridors include R.K. Ashram Marg to Indraprastha (9.913 Kms), Aerocity to IGD Airport T-1 (2.263 kms) and Tughlakabad to Kalindi Kunj (3.9 kms) as part of Delhi Metro’s Phase-V–V(A) project comprising 16.076 kms, which will further enhance connectivity within the national capital.

Also Read

Tripura Protest for Bangladesh Hindu Death

VHP, Bajrang Dal protest in Tripura over attacks on Hindus in Bangladesh

1 hour ago
Aravallis

No mining, no dilution: Govt imposes complete ban on fresh mining in Aravallis

1 hour ago

The total project cost of Delhi Metro’s Phase V(A) project will be sourced from the Government of India, the Government of Delhi, and international funding agencies, according to an official statement.

The Central Vista corridor will provide connectivity to all the Kartavya Bhawans, thereby providing doorstep connectivity to the office goers and visitors in this area. With this connectivity, around 60,000 office goers and 2 lakh visitors will benefit on a daily basis. These corridors will further reduce pollution and usage of fossil fuels, enhancing ease of living.

The RK Ashram Marg – Indraprastha section will be an extension of the Botanical Garden-R.K. Ashram Marg corridor. It will provide Metro connectivity to the Central Vista area, which is currently under redevelopment. The Aerocity – IGD Airport Terminal 1 and Tughlakabad – Kalindi Kunj sections will be an extension of the Aerocity-Tughlakabad corridor and will boost connectivity of the airport with the southern parts of the national capital in areas such as Tughlakabad, Saket, Kalindi Kunj, etc. These extensions will comprise 13 stations. Out of these, 10 stations will be underground, and 3 stations will be elevated.

After completion, the corridor-1, namely R.K Ashram Marg to Indraprastha (9.913 Kms), will improve the connectivity of West, North and old Delhi with Central Delhi and the other two corridors, namely Aerocity to IGD Airport T-1 (2.263 kms) and Tughlakabad to Kalindi Kunj (3.9 kms), will connect south Delhi with the domestic Airport Terminal-1 via Saket, Chattarpur, etc, which will tremendously boost connectivity within the National Capital.

These metro extensions of the Phase-V(A) project will expand the reach of the Delhi Metro network in Central Delhi and the Domestic Airport, thereby further boosting the economy. These extensions of the Magenta Line and Golden Line will reduce congestion on the roads; thus, they will help in reducing the pollution caused by motor vehicles.

The stations, which shall come up on the RK Ashram Marg, Indraprastha section, are: R.K. Ashram Marg, Shivaji Stadium, Central Secretariat, Kartavya Bhawan, India Gate, War Memorial – High Court, Baroda House, Bharat Mandapam, and Indraprastha.

The stations on the Tughlakabad–Kalindi Kunj section will be Sarita Vihar Depot, Madanpur Khadar, and Kalindi Kunj, while the Aerocity station will be connected further with the IGD T-1 station.

The project is aimed at improving last-mile connectivity and easing congestion on some of the national capital’s most crowded stretches. The completion of the project within the next three years will take the Delhi Metro network past the 400-kilometre mark.

“With this expansion, a new chapter will be added to the Delhi Metro. For this purpose, a project worth Rs 12,015 crore has been sanctioned,” Union Minister Ashwini Vaishnaw told journalists after the Cabinet meeting.

An estimated 33,000 tonnes of CO2 emissions will be saved with this project, the minister explained.

The expansion will result in including 13 new stations to the existing network, linking residential colonies, commercial areas and transit interchanges.

Construction of Phase-I, V, consisting of 111 km and 83 stations, are underway, and as of today, about 80.43% of the civil construction of Phase-IV (3 Priority) corridors has been completed. The Phase-IV (3 Priority) corridors are likely to be completed in stages by December 2026.

Today, the Delhi Metro caters to an average of 65 lakh passenger journeys per day. The maximum passenger journey recorded so far is 81.87 lakh on August 08, 2025. Delhi Metro has become the lifeline of the city by setting the epitome of excellence in the core parameters of MRTS, punctuality, reliability, and safety.

A total of 12 metro lines of about 395 km with 289 stations are being operated by DMRC in Delhi and NCR at present. Today, Delhi Metro has the largest Metro network in India and is also one of the largest Metros in the world.

Orissa POST – Odisha’s No.1 English Daily
Tags: Delhi MetroNarendra ModiUnion Cabinet
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Vandana Singh

December 12, 2019
#MyPaperBagChallenge

D Rama Rao

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Tabish Maaz

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Adyasha Priyadarsani Sendha

December 12, 2019
#MyPaperBagChallenge

Mandakini Dakua

December 12, 2019
#MyPaperBagChallenge

Akshaya Kumar Dash

December 12, 2019
#MyPaperBagChallenge

Anasuya Sahoo

December 12, 2019
#MyPaperBagChallenge

Jyotshna Mayee Pattnaik

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Aishwarya Ranjan Mohanty

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Sibarama Khotei

December 12, 2019
#MyPaperBagChallenge

Adweeti Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Priyabrata Mohanty

December 12, 2019
#MyPaperBagChallenge

Sarmistha Nayak

December 12, 2019
#MyPaperBagChallenge

Mrutyunjaya Behera

December 12, 2019
#MyPaperBagChallenge

Sarfraz Ahmad

December 12, 2019
#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Pitabas Tripathy

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Geetanjali Patro

December 12, 2019

Archives

Editorial

Half A Loaf

European leaders
December 24, 2025

European leaders did what they are known to be good at – a brand of diplomacy aimed at antagonizing neither...

Read moreDetails

Far-Right Chile

Jose Antonio Kast
December 23, 2025

Far-Right politics has claimed yet another South American country – Chile - with the recent victory of the ultraconservative lawyer,...

Read moreDetails

Diplomatic Failure

December 22, 2025

Bangladesh has once again been gripped by violent unrest fol lowing the death of youth leader Sharif Osman Hadi, deepen...

Read moreDetails

Rushed Laws

December 21, 2025

On December 17, Wayanad MP Priyanka Gandhi Vadra asked the Lok Sabha to send the Viksit Bharat - Guarantee For...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST