Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

ISRO achieves breakthrough in Semicryogenic engine development for LVM3

PTI
Updated: March 29th, 2025, 17:49 IST
in Sci-Tech
0
ISRO
Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

Bengaluru: ISRO has announced significant progress in the design and development of a Semicryogenic engine or Liquid Oxygen / Kerosene engine with a high thrust of 2,000 kN (kilonewton) that will power the Semicryogenic booster stage of the Launch Vehicle Mark-3 (LVM3).

The first major breakthrough in the semicryogenic engine development programme was achieved on March 28, when the first successful hot test of Engine Power Head Test Article (PHTA), was carried out at ISRO Propulsion Complex, Mahendragiri, Tamil Nadu, it said.

Also Read

International Space Station ISS Wiki

Elon Musk suggests deorbiting International Space Station within two years

3 days ago
Shubhanshu Shukla

No new date launch date for Axiom-4 mission to ISS yet

3 days ago

Highlighting that the Friday’s test demonstrated the smooth ignition and boost strap mode operation of the engine for a test duration of 2.5 seconds, the space agency said the objective of the test was to validate the integrated performance of the critical subsystems such as the pre-burner, turbo pumps, start system and control components by carrying out a hot-firing for a short-duration of 2.5 seconds.

“The test proceeded as predicted and all the engine parameters were as expected. With this breakthrough, ISRO is further planning a series of tests on the PHTA to further validate and finetune the performance before the realization of the fully integrated engine,” it said.

Noting that the Liquid Propulsion Systems Centre (LPSC) of ISRO is developing the Semi cryogenic propulsion Engine and Stage, ISRO said the stage (SC120) powered by the 2,000kN semi-cryogenic engine (SE2000) will replace the present core liquid stage (L110) of LVM3 for payload enhancement and power the booster stages of future launch vehicles.

Non toxic and non hazardous propellants (Liquid Oxygen and Kerosene) are employed in Semi cryogenic propulsion and this will deliver higher performance compared to existing L110 stage.

Induction of the Semi cryogenic propulsion system along with an uprated cryogenic stage in the LVM3 vehicle enhances its payload capability from 4 tonne to 5 tonne in Geosynchronous Transfer Orbit (GTO), it added.

According to ISRO, major subsystems of the SE-2000 engine include thrust chamber, pre-burner, turbo pump system, control components and start up system.

“…the complex engine hardware uses special materials to withstand the high temperature and oxidiser rich combustion. The hardware along with the space grade kerosene are realised in partnership with Indian industry. The development of this engine in these high thrust levels is highly challenging and this technology is available with only very few nations.”

The realization of a test facility to qualify the engine and stage is equally complex and challenging, ISRO said.

The complex Semicryogenic Integrated Engine Test facility (SIET) was established at its Propulsion Research Complex (IPRC), Mahendragiri for testing the engine and stage and was dedicated to the nation by Prime Minister Narendra Modi on February 27 last year.

Prior to the conduct of integrated engine-level hot tests, it is planned to carry out performance evaluation tests of the intermediate configuration, designated as Power Head Test Article (PHTA), which comprises all the engine systems except the thrust chamber, it said.

The hot test that was carried out Friday, is the first of a series of tests planned to validate the design of the propellant feed system, including the low-pressure and high-pressure turbo-pumps, the pre-burner, start system and control components.

“All subsystems for the test were realized and had undergone rigorous qualification tests prior to integration to Power Head Test Article,” the space agency said.

The ignition sequence for PHTA was derived from a series of hot tests in single element level, ISRO said. In order to ensure the smooth ignition process during the PHTA test, another test article, Pre-burner Ignition Test Article (PITA), was realized, which consists of the pre-burner along with its feed systems, start-systems, and related control components.

PTI

Tags: IndiaISROrocketspaceTech
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Bijswajit Pradhan

December 12, 2019
#MyPaperBagChallenge

Swarit Praharaj

December 12, 2019
#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Vandana Singh

December 12, 2019
#MyPaperBagChallenge

Lopali Pattnaik

December 12, 2019
#MyPaperBagChallenge

Debasis Mohanty

December 12, 2019
#MyPaperBagChallenge

Shreyanshu Bal

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019
#MyPaperBagChallenge

Kamana Singh

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Jyotshna Mayee Pattnaik

December 12, 2019
#MyPaperBagChallenge

Sarfraz Ahmad

December 12, 2019
#MyPaperBagChallenge

Mrutyunjaya Behera

December 12, 2019
#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Keshab Chandra Rout

December 12, 2019
#MyPaperBagChallenge

Pragyan Priyambada

December 12, 2019
#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Manas Samanta

December 12, 2019
#MyPaperBagChallenge

Jhili Jena

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019
#MyPaperBagChallenge

Sibarama Khotei

December 12, 2019

Archives

Editorial

Nameless Doctrine

June 15, 2025

On 12 June, the United Nations General Assembly adopted a resolution demanding an immediate, unconditional and lasting ceasefire in Gaza....

Read more

Graft in ED

June 14, 2025

When a senior Enforcement Directorate (ED) officer gets caught in a graft case, eyebrows go up. But when insiders start...

Read more

Clash of Titans

June 11, 2025

The world is watching with bated breath the fierce showdown between the richest man on earth Elon Musk and the...

Read more

Basics of Diplomacy

Diplomacy
June 10, 2025

It is unfortunate that India has finally got an invitation to attend the G7 summit in Alberta, Canada, to be...

Read more
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2024 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2024 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2024 All rights Reserved by OrissaPOST