Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

ISRO achieves breakthrough in Semicryogenic engine development for LVM3

PTI
Updated: March 29th, 2025, 17:49 IST
in Sci-Tech
0
ISRO
Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

Bengaluru: ISRO has announced significant progress in the design and development of a Semicryogenic engine or Liquid Oxygen / Kerosene engine with a high thrust of 2,000 kN (kilonewton) that will power the Semicryogenic booster stage of the Launch Vehicle Mark-3 (LVM3).

The first major breakthrough in the semicryogenic engine development programme was achieved on March 28, when the first successful hot test of Engine Power Head Test Article (PHTA), was carried out at ISRO Propulsion Complex, Mahendragiri, Tamil Nadu, it said.

Also Read

AI or Artificial intelligence

Trump says top tech firms have signed accord to ‘self-police’ AI development

2 days ago
OpenAI

OpenAI delays latest model over security concerns, as industry faces new safety pressures

3 days ago

Highlighting that the Friday’s test demonstrated the smooth ignition and boost strap mode operation of the engine for a test duration of 2.5 seconds, the space agency said the objective of the test was to validate the integrated performance of the critical subsystems such as the pre-burner, turbo pumps, start system and control components by carrying out a hot-firing for a short-duration of 2.5 seconds.

“The test proceeded as predicted and all the engine parameters were as expected. With this breakthrough, ISRO is further planning a series of tests on the PHTA to further validate and finetune the performance before the realization of the fully integrated engine,” it said.

Noting that the Liquid Propulsion Systems Centre (LPSC) of ISRO is developing the Semi cryogenic propulsion Engine and Stage, ISRO said the stage (SC120) powered by the 2,000kN semi-cryogenic engine (SE2000) will replace the present core liquid stage (L110) of LVM3 for payload enhancement and power the booster stages of future launch vehicles.

Non toxic and non hazardous propellants (Liquid Oxygen and Kerosene) are employed in Semi cryogenic propulsion and this will deliver higher performance compared to existing L110 stage.

Induction of the Semi cryogenic propulsion system along with an uprated cryogenic stage in the LVM3 vehicle enhances its payload capability from 4 tonne to 5 tonne in Geosynchronous Transfer Orbit (GTO), it added.

According to ISRO, major subsystems of the SE-2000 engine include thrust chamber, pre-burner, turbo pump system, control components and start up system.

“…the complex engine hardware uses special materials to withstand the high temperature and oxidiser rich combustion. The hardware along with the space grade kerosene are realised in partnership with Indian industry. The development of this engine in these high thrust levels is highly challenging and this technology is available with only very few nations.”

The realization of a test facility to qualify the engine and stage is equally complex and challenging, ISRO said.

The complex Semicryogenic Integrated Engine Test facility (SIET) was established at its Propulsion Research Complex (IPRC), Mahendragiri for testing the engine and stage and was dedicated to the nation by Prime Minister Narendra Modi on February 27 last year.

Prior to the conduct of integrated engine-level hot tests, it is planned to carry out performance evaluation tests of the intermediate configuration, designated as Power Head Test Article (PHTA), which comprises all the engine systems except the thrust chamber, it said.

The hot test that was carried out Friday, is the first of a series of tests planned to validate the design of the propellant feed system, including the low-pressure and high-pressure turbo-pumps, the pre-burner, start system and control components.

“All subsystems for the test were realized and had undergone rigorous qualification tests prior to integration to Power Head Test Article,” the space agency said.

The ignition sequence for PHTA was derived from a series of hot tests in single element level, ISRO said. In order to ensure the smooth ignition process during the PHTA test, another test article, Pre-burner Ignition Test Article (PITA), was realized, which consists of the pre-burner along with its feed systems, start-systems, and related control components.

PTI

Tags: IndiaISROrocketspaceTech
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Adrita Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
#MyPaperBagChallenge

Dibya Ranjan Das

December 12, 2019
#MyPaperBagChallenge

Keshab Chandra Rout

December 12, 2019
#MyPaperBagChallenge

Narendra Kumar

December 12, 2019
#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Mandakini Dakua

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019
#MyPaperBagChallenge

Bijswajit Pradhan

December 12, 2019
#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Vandana Singh

December 12, 2019
#MyPaperBagChallenge

Swarit Praharaj

December 12, 2019
#MyPaperBagChallenge

Diptiranjan Biswal

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Matrumangal Jena

December 12, 2019
#MyPaperBagChallenge

Sarmistha Nayak

December 12, 2019
#MyPaperBagChallenge

Kamana Singh

December 12, 2019
#MyPaperBagChallenge

Lopali Pattnaik

December 12, 2019
#MyPaperBagChallenge

Archana Parida

December 12, 2019
#MyPaperBagChallenge

Sibarama Khotei

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Pragyan Priyambada

December 12, 2019
#MyPaperBagChallenge

Archit Mohapatra

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Shreyanshu Bal

December 12, 2019
#MyPaperBagChallenge

Rajashree Manasa Mohanty

December 12, 2019

Archives

Editorial

SC In Spotlight

Supreme court
September 30, 2026

Lately, the Supreme Court’s intervention in high-profile cases does not necessarily arouse confidence and reassurance that wrongs may be righted....

Read moreDetails

Trump & Xi

Donald Trump (L) and Xi Jinping
September 29, 2026

The recent meeting between US President Donald Trump and Chinese President Xi Jinping turned out to be a rather tame...

Read moreDetails

Trust Deficit for EC

Election Commission of India
September 28, 2026

After remaining deafeningly silent on a media report casting serious doubts about the fairness and functioning of the Election Commission...

Read moreDetails

The Rot Within

Aakar Patel
September 27, 2026

By Aakar Patel Corruption and bribery are two words that are interchangeable. Or are they? Bribery, in the way that...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST