Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Leaky valve, low pressure in propellant tank led to GSLV failure in August last year: ISRO

PTI
Updated: March 26th, 2022, 14:32 IST
in Sci-Tech
0
ISRO

Representational image

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

New Delhi: A leak valve and low pressure build up in the liquid hydrogen tank that fed the cryogenic engine of India’s heavy-lift rocket GSLV has been identified as the reason for the failure to put Geo Imaging Satellite (GISAT-1) into orbit in August last year, a report has revealed.

The Failure Analysis Committee (FAC) set up by ISRO found that the GISAT-1 mission failed owing to a damage in the soft seal in a critical valve which resulted in lower pressure in the rocket’s liquid hydrogen (LH2) tank, the space agency said on Friday.

Also Read

Shubhanshu Shukla

Axiom-4 learnings linked to Gaganyaan planning: Shubhanshu Shukla

1 day ago
Heat wave, Odisha

Odisha among states where 80% people report facing severe heat waves: Study

2 days ago

The FAC found that the failure happened when the Geosynchronous Satellite Launch Vehicle (GSLV) rocket’s cryogenic engine was to kick in to take the rocket forward.

The GSLV-F-10 rocket had lifted off normally from Sriharikota on August 12 last year but the mission had to be aborted 307 seconds later as the launch vehicle veered off its charted course.

“The FAC concluded that the lower LH2 tank pressure at the time of CUS (cryogenic upper stage) engine ignition, caused by the leakage of Vent and Relief Valve (VRV) resulted in the malfunctioning of the Fuel Booster Turbo Pump (FBTP), leading to mission abort command and subsequent failure of the mission,” the ISRO said.

“The most probable reason for the leakage of VRV is attributed to the damage in the soft seal that could have occurred during the valve operations or due to contamination and valve mounting stresses induced under cryogenic temperature conditions,” it added.

The space agency said the FAC observed that a deviation in performance of the cryogenic engine was observed at 297.3 seconds after lift-off due to which the onboard computer aborted the mission at 307 seconds.

According to it, the ground servicing of the cryogenic stage/engine was normal and the required lift-off conditions were achieved.

However, subsequent to lift-off, the FAC observed that the build-up of pressure in the propellant (liquid hydrogen or LH2) tank during the flight was not normal leading to a lower tank pressure at the time of ignition of the engine, the ISRO said.

“This resulted in anomalous operation of the Fuel Booster Turbo Pump mounted inside the LH2 tank which feeds the main turbopump of the engine resulting in insufficient flow of liquid hydrogen into the engine thrust chamber,” the ISRO said.

According to the ISRO, detailed studies indicate that the most likely reason for the observed reduction in LH2 tank pressure is a leak in the respective VRV, which is used for relieving the excess tank pressure during flight.

Computer simulations as well as multiple confirmatory ground tests, closely simulating the conditions in the GSLV-F10 flight, validated the analysis by the FAC, the space agency said.

According to the ISRO, the FAC has submitted comprehensive recommendations to enhance the robustness of the cryogenic engine for future GSLV missions.

The recommendations include an active LH2 tank pressurisation system to be incorporated to ensure sufficient pressure in the LH2 tank at the appropriate time before engine start command, strengthening of VRV and associated fluid circuits to avoid the possibility of leakage along with the automatic monitoring of additional cryogenic stage parameters for giving lift-off clearance.

PTI

Tags: FACGSLVISRO
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Keshab Chandra Rout

December 12, 2019
#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019
#MyPaperBagChallenge

Debasis Mohanty

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Chinmay Kumar Routray

December 12, 2019
#MyPaperBagChallenge

Vandana Singh

December 12, 2019
#MyPaperBagChallenge

Jhili Jena

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Diptiranjan Biswal

December 12, 2019
#MyPaperBagChallenge

Sarmistha Nayak

December 12, 2019
#MyPaperBagChallenge

Adweeti Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Pragyan Priyambada

December 12, 2019
#MyPaperBagChallenge

Tabish Maaz

December 12, 2019
#MyPaperBagChallenge

Matrumangal Jena

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Akshaya Kumar Dash

December 12, 2019
#MyPaperBagChallenge

Geetanjali Patro

December 12, 2019
#MyPaperBagChallenge

Narendra Kumar

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Adyasha Priyadarsani Sendha

December 12, 2019
#MyPaperBagChallenge

Smitarani Sahoo

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019

Archives

Editorial

German Challenge

November 19, 2025

The first murmurings of rebellion against Germany’s Chancellor Friedrich Merz are now being heard, just six months after he assumed...

Read moreDetails

Hasina’s Death Penalty

Sheikh Hasina
November 18, 2025

A tribunal in Bangladesh has sentenced former Prime Minister Sheikh Hasina November 17 to death. The verdict was pronounced after...

Read moreDetails

Bihar Show

Bihar poll
November 17, 2025

Recent election results from Bihar Legislative Assembly could be counted as great pointers for the emergence, in the near future,...

Read moreDetails

Downward Drift

November 16, 2025

Aakar Patel Some years ago, NITI Aayog said it would prepare a ‘single, informative dashboard for all the twenty-nine (later...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST