Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Leaky valve, low pressure in propellant tank led to GSLV failure in August last year: ISRO

PTI
Updated: March 26th, 2022, 14:32 IST
in Sci-Tech
0
ISRO

Representational image

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

New Delhi: A leak valve and low pressure build up in the liquid hydrogen tank that fed the cryogenic engine of India’s heavy-lift rocket GSLV has been identified as the reason for the failure to put Geo Imaging Satellite (GISAT-1) into orbit in August last year, a report has revealed.

The Failure Analysis Committee (FAC) set up by ISRO found that the GISAT-1 mission failed owing to a damage in the soft seal in a critical valve which resulted in lower pressure in the rocket’s liquid hydrogen (LH2) tank, the space agency said on Friday.

Also Read

IIT Mandi

IIT Mandi develops operational landslide early warning system for Indian himalayan region

1 day ago
Unified Payments Interface

India’s UPI to link up with Indonesia’s payment system; details here

2 days ago

The FAC found that the failure happened when the Geosynchronous Satellite Launch Vehicle (GSLV) rocket’s cryogenic engine was to kick in to take the rocket forward.

The GSLV-F-10 rocket had lifted off normally from Sriharikota on August 12 last year but the mission had to be aborted 307 seconds later as the launch vehicle veered off its charted course.

“The FAC concluded that the lower LH2 tank pressure at the time of CUS (cryogenic upper stage) engine ignition, caused by the leakage of Vent and Relief Valve (VRV) resulted in the malfunctioning of the Fuel Booster Turbo Pump (FBTP), leading to mission abort command and subsequent failure of the mission,” the ISRO said.

“The most probable reason for the leakage of VRV is attributed to the damage in the soft seal that could have occurred during the valve operations or due to contamination and valve mounting stresses induced under cryogenic temperature conditions,” it added.

The space agency said the FAC observed that a deviation in performance of the cryogenic engine was observed at 297.3 seconds after lift-off due to which the onboard computer aborted the mission at 307 seconds.

According to it, the ground servicing of the cryogenic stage/engine was normal and the required lift-off conditions were achieved.

However, subsequent to lift-off, the FAC observed that the build-up of pressure in the propellant (liquid hydrogen or LH2) tank during the flight was not normal leading to a lower tank pressure at the time of ignition of the engine, the ISRO said.

“This resulted in anomalous operation of the Fuel Booster Turbo Pump mounted inside the LH2 tank which feeds the main turbopump of the engine resulting in insufficient flow of liquid hydrogen into the engine thrust chamber,” the ISRO said.

According to the ISRO, detailed studies indicate that the most likely reason for the observed reduction in LH2 tank pressure is a leak in the respective VRV, which is used for relieving the excess tank pressure during flight.

Computer simulations as well as multiple confirmatory ground tests, closely simulating the conditions in the GSLV-F10 flight, validated the analysis by the FAC, the space agency said.

According to the ISRO, the FAC has submitted comprehensive recommendations to enhance the robustness of the cryogenic engine for future GSLV missions.

The recommendations include an active LH2 tank pressurisation system to be incorporated to ensure sufficient pressure in the LH2 tank at the appropriate time before engine start command, strengthening of VRV and associated fluid circuits to avoid the possibility of leakage along with the automatic monitoring of additional cryogenic stage parameters for giving lift-off clearance.

PTI

Tags: FACGSLVISRO
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Narendra Kumar

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

Tapaswini Mallick

December 12, 2019
#MyPaperBagChallenge

Lopali Pattnaik

December 12, 2019
#MyPaperBagChallenge

Anasuya Sahoo

December 12, 2019
#MyPaperBagChallenge

Mandakini Dakua

December 12, 2019
#MyPaperBagChallenge

Chinmay Kumar Routray

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

Swarit Praharaj

December 12, 2019
#MyPaperBagChallenge

Jyotshna Mayee Pattnaik

December 12, 2019
#MyPaperBagChallenge

Diptiranjan Biswal

December 12, 2019
#MyPaperBagChallenge

Rajashree Manasa Mohanty

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Smitarani Sahoo

December 12, 2019
#MyPaperBagChallenge

Archana Parida

December 12, 2019
#MyPaperBagChallenge

Aishwarya Ranjan Mohanty

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Manas Samanta

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Faiza Firdous

December 12, 2019
#MyPaperBagChallenge

Pragyan Priyambada

December 12, 2019
#MyPaperBagChallenge

Sibarama Khotei

December 12, 2019

Archives

Editorial

Shutting Out ‘Satluj’

Satluj
July 8, 2026

Art, books and cinema have been at the forefront when it comes to representing the voice of the people and...

Read moreDetails

SIR Merry Go Round

SIR
July 7, 2026

The worst fears of people about inherent dangers of the Special Intensive Revision (SIR) of electoral rolls seem to be...

Read moreDetails

Citizens High & Dry

Crude oil
July 6, 2026

The significant fall in global crude oil prices following the interim peace deal signed between the US and Iran should...

Read moreDetails

Violence as Virtue

Aakar Patel
July 5, 2026

By Aakar Patel The teaser for Chauhaan - the latest in the line of movies selling majoritarian propaganda - is...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST