Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Most of Rs 7L cr road projects to be awarded by Dec 2018: Min

Updated: October 25th, 2017, 19:49 IST
in Uncategorized
0
Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

New Delhi, Oct 25: Promising that India’s biggest-ever Rs 7-lakh crore umbrella highway programme, including the ambitious Bharatmala, will be “transparent and corruption free”, Union minister Nitin Gadkari Wednesday said most of these will be rolled out by December 2018.

Terming the massive infrastructure push as a step closer to achieving the target of Rs 25 lakh crore worth of work in the highways and shipping space in five years, creating one crore jobs and contributing 2-3 percent to GDP, Gadkari claimed that this will change the very face of India.

Also Read

Russia-India Ties

India-Russia ties in focus during Manturov’s Delhi visit

35 minutes ago
Khalistan issue flagged again during talks between PM Modi and Starmer: Foreign Secretary

Vikram Misri backs dialogue at global meet on Hormuz

42 minutes ago

“We will roll out most of the Rs 7 lakh crore projects announced by the government yesterday, before December 2018.

The programme is the biggest infrastructure programme, including Bharatmala, that will see India having 50 corridors including the existing six,” the road transport, shipping, highways and water resources minister said while addressing the media here.

India will have “world-class roads on par with the US and Germany” and special emphasis has been accorded to providing quality roads on borders adjoining China and Pakistan, besides far-flung tribal areas.

The government Tuesday approved a mega plan to build 83,677 km of highways by March 2022 at a cost of about Rs 7 lakh crore, which includes the ambitious Bharatmala project.

He said the detailed project reports (DPRs) for about 25,000 km of highway projects are almost ready and the Rs 7 lakh crore programme would create 10 crore mandays, in addition to 22 million permanent jobs.

“The entire programme will be transparent, corruption-free with full emphasis on quality. Each and every work will be through electronic tenders and the quality of highways would be such that they would see no potholes for the next 100 years,” Gadkari said.

The project, he added, was aimed at overhauling India’s infrastructure matching Prime Minister Narendra Modi’s New India vision.

About the funding of the Rs 5.35 lakh crore Bharatmala, he said it has been fully tied up as Rs 2.37 lakh crore would flow from the central road fund, Rs 2.05 lakh crore as market borrowing, Rs 34,000 crore from monetisation of highway projects and Rs 60,000 crore through budgetary allocation.

He stressed that funding is not a problem for the entire project as funds to the tune of Rs 4-5 lakh crore can be raised from the capital market and the finance ministry has been approached for enhanced support.

In addition, the minister spoke of exploring pension and other investment funds while money can be raised through bonds and NHAI, a flagship organisation of the ministry that has a rating of AAA+.

Asked about land acquisition, Gadkari admitted that though it is “tough and complicated”, it is not a problem for the ministry as farmers and others were making a beeline to offer their land for the highway projects after enhanced compensation.

Expressing confidence in timely completion of projects in which Rs 1.25 lakh crore was expected from private players, the minister said the award of projects has risen manifold and in the current fiscal, the target is to award 20,000 km of highways.

2012-13 saw award of 1,916 km, 2013-14 3,620 km, 2014-15 7,972 km while in 2015-16, the award quantum grew to 10,098. Last fiscal, it touched 15,948 km.

According to the minister, under the first phase of Bharatmala, a total of 550 districts in the country will be linked with National Highways.

Apart from building corridors at a cost of Rs 1.2 lakh crore, lane expansion will be done at 34 places, apart from constructing logistics parks at 35 locations. In addition, way side amenities will be created at 180 sites in two years with each having much job potential, he said.

The minister also announced that the Rs 44,000 crore Vadodara-Mumbai project will start soon, besides completion of Eastern Peripheral Expressway to decongest Delhi within a month.

The 44 new economic corridors include Mumbai-Kolkata, Mumbai-Kanyakumari, Amritsar-Jamnagar, Kandla-Sagar, Agra-Mumbai, Pune-Vijaywada, Raipur-Dhanbad, Ludhiana-Ajmer, Surat-Nagpur, Hyderabad-Panaji, Jaipur-Indore, Solapur-Nagpur,

Sagar-Varanasi, Kharagpur-Siliguri, Raipur-Vishakhapatnam, Delhi-Lucknow, Chennai-Kurnool and Indore-Nagpur.

Other corridors to be built are Chennai-Madurai,

Mangalore-Raichur, Tuticorin-Cochin, Solapur-Bellary, Hyderabad-Auranagabad, Delhi-Kanpur, Sagar-Lucknow and Sambalpur-Ranchi.

There are 65 inter-corridor and feeder roads coming up, besides 115 feeder roads.

Bharatmala works have been proposed for completion in five years by 2021-22 through NHAI, NHIDCL, MoRTH and state PWDs and substantial delegation of powers has been provided to NHAI, NHIDCL and the Ministry of Road Transport and Highways (MoRTH) to facilitate speedy implementation.

Terming Bharatmala as “connecting India like never before”, the PMO has said the Rs 5.35 lakh km project will include 9,000 km of economic corridors to unlock full economic potential, 6,000 km of inter-corridor and feeder routes, 5,000 km of national corridors, 2,000 km of border road connectivity, 800 km of expressways and 10,000 km of balance NHDP projects. (PTI)

ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Vandana Singh

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Manas Samanta

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Geetanjali Patro

December 12, 2019
#MyPaperBagChallenge

Tapaswini Mallick

December 12, 2019
#MyPaperBagChallenge

Priyabrata Mohanty

December 12, 2019
#MyPaperBagChallenge

Faiza Firdous

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Swarit Praharaj

December 12, 2019
#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Chinmay Kumar Routray

December 12, 2019
#MyPaperBagChallenge

Debasis Mohanty

December 12, 2019
#MyPaperBagChallenge

Jyotshna Mayee Pattnaik

December 12, 2019
#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Akshaya Kumar Dash

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
#MyPaperBagChallenge

Pratyasharani Ghibela

December 12, 2019
#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Keshab Chandra Rout

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

D Rama Rao

December 12, 2019
#MyPaperBagChallenge

Anasuya Sahoo

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019

Archives

Editorial

Trump Trapped

Donald Trump
April 1, 2026

It is the fifth week running since US President Donald Trump and Israeli Prime Minister Benjamin Netanyahu launched the war...

Read moreDetails

Not Forgetting Myanmar

March 31, 2026

While a big war is being waged in the Middle East, global attention has moved away from another theatre of...

Read moreDetails

Fuel Politics

Fuel Politics
March 30, 2026

Fuel has been a long-time great economic and political tool in the hands of the government in India. It enables...

Read moreDetails

Selective Outrage

Aakar Patel
March 29, 2026

Consider this thought experiment. Imagine that two large missiles struck the White House. The first hit the residential quarters at...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST