Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

SBI moves SC seeking extension of time to disclose details of electoral bonds

PTI
Updated: March 4th, 2024, 20:00 IST
in Business, Home News, National
0
SBI electoral bond
Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

New Delhi: State Bank of India Monday moved the Supreme Court seeking an extension of time till June 30 to disclose details of each electoral bond encashed by political parties.

In an application filed before the top court, State Bank of India (SBI) contended that retrieval of information from “each silo” and the procedure of matching the information of one silo to that of the other would be a time-consuming exercise.

Also Read

Nepal's Rashtriya Swatantra Party chief Ravi Lamichhane met Kathmandu Metropolitan City mayor Balendra Shah to discuss possible cooperation and collaboration for the upcoming general election in the Himalayan nation next year.

Nepal PM Shah to visit India November 22-23

1 hour ago

Cauvery dispute: SC rejects Tamil Nadu’s plea for more water from Karnataka

2 hours ago

The plea submitted that due to stringent measures undertaken to ensure that the identity of the donors was kept anonymous, “decoding’ the electoral bonds and matching donors to the donations made would be a complex process.

“It submitted that the data related to the issuance of the bond and the data related to the redemption of the bond was kept recorded in two different silos. No central database was maintained. This was done to ensure that donors’ anonymity would be protected.

“It is submitted that donor details were kept in a sealed cover at the designated branches and all such sealed covers were deposited in the Main Branch of the Applicant bank, which is located in Mumbai,” the plea said.

In a landmark judgement that delivered a big blow to the government, the Supreme Court February 15 annulled the electoral bonds scheme for political funding, saying it violates the Constitutional right to freedom of speech and expression as well as the right to information.

In its verdict months ahead of the Lok Sabha polls, the apex court ordered SBI to disclose to the Election Commission the names of the contributors to the six-year-old scheme.

A five-judge Constitution bench headed by Chief Justice DY Chandrachud directed that the SBI must disclose details of each electoral bond encashed by political parties. The information should include the date of encashment and the denomination of the bonds and be submitted to the poll panel by March 6.

PTI

Tags: Electoral bondsSBISupreme Court
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Sibarama Khotei

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Tapaswini Mallick

December 12, 2019
#MyPaperBagChallenge

Sarmistha Nayak

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019
#MyPaperBagChallenge

Anasuya Sahoo

December 12, 2019
#MyPaperBagChallenge

Matrumangal Jena

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019
#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Archit Mohapatra

December 12, 2019
#MyPaperBagChallenge

Mrutyunjaya Behera

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Sarfraz Ahmad

December 12, 2019
#MyPaperBagChallenge

Kamana Singh

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Akshaya Kumar Dash

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Manas Samanta

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Sitakanta Mohanty

December 12, 2019
#MyPaperBagChallenge

Adweeti Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Debasis Mohanty

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Pitabas Tripathy

December 12, 2019

Archives

Editorial

Tech Terror

November 18, 2026

It cannot be a coincidence that when the world was still trying to come to terms with the prospect of...

Read moreDetails

More Miseries Ahead

Inflation in India
November 17, 2026

Life is getting difficult by the day for Indians with all us citizens reeling under the dual shocks of rising...

Read moreDetails

Tough Times

Press
November 16, 2026

Press freedom has, for years, been under attack almost everywhere across the globe, but the situation has never been as...

Read moreDetails

Democracy Strikes Back

Rights & Restrictions: AAKAR PATEL
November 15, 2026

By Aakar Patel Democracies correct themselves through elections. The leadership of every nation is imperfect, and the problems become especially...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST