Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

SJVN to develop 669 MW Lower Arun Hydro Power project in Nepal

Updated: June 1st, 2023, 19:42 IST
in National
0
Construction of Arun-III Hydroelectric Project on Arun river in Nepal by India's Satluj Jal Vidyut Nigam Limited

Construction of Arun-III Hydroelectric Project on Arun river in Nepal by India's Satluj Jal Vidyut Nigam Limited

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

New Delhi: State-owned Satluj Jal Vidyut Nigam Ltd Thursday inked a project development agreement with Investment Board of Nepal to develop 669 MW Lower Arun Hydro Power project worth Rs 5,792 crore in Nepal.

The agreement was inked in the presence of Prime Minister Narendra Modi and Prime Minister of Nepal Pushpa Kamal Dahal, according to a statement.

Also Read

 A Delhi court Wednesday sent the son of the building owner, the PG operator, and the labour contractor arrested in connection with the Satya Niketan building collapse to two days of police custody. Judicial Magistrate Kautuk Bharadwaj passed the order after the Delhi Police sought three days’ custody of the three accused -- Mahesh Gupta, PG operator Sudhanshu and contractor Sanoj. Gupta was produced before the Patiala House Court after completion of his two-day police custody, while Sudhanshu and Sanoj were produced before the court following their arrest Tuesday. The five-storey building, known as ‘Hostel Daze’, was being operated as a boys’ paying guest accommodation and several students were staying there when it collapsed at around 1.30 pm Sunday, leaving seven people dead

Satya Niketan building collapse: Court sends three accused to 2-day police custody

44 minutes ago
IAF aircraft

India sends 8th IAF aircraft with 35 tonnes of relief supplies to flood-hit Nepal

47 minutes ago

“…A Project Development Agreement (PDA) of 669 MW Lower Arun Hydro Electric Project in Nepal has been signed,” it said.

The PDA was signed by Nand Lal Sharma, Chairman & Managing Director of SJVN, and Sushil Bhatta, CEO of Investment Board of Nepal, here Thursday, it stated.

Sharma said SJVN is committed to make Lower Arun project a Model Hydro Project with complete execution, from concept to commissioning within 7 to 8 years.

“This is our second large-scale investment in Nepal after 900 MW Arun-3 HEP (Hydro Electric Project) which is in advance stage of construction. Now, our target is to start the construction of the project in current fiscal after obtaining investment approval from Government of India,” Sharma said.

According to him, the project shall be constructed in five years at a cost of Rs 5,792 crore with a levelised tariff of Rs 4.99 per unit. The project will be developed on BOOT (build own operate transfer) basis, and on completion, it will generate 2,901 million units of energy, annually.

The project is located in the Sankhuwasabha and Bhojpur districts of Nepal.

SJVN won the project through International Competitive Bidding in February 2021.

SJVN is already operating India’s largest underground 1,500 MW Nathpa Jhakri Hydro Power Station in tandem with 412 MW Rampur Hydro Power Station in Himachal Pradesh.

In addition, SJVN is developing a 217 kilometre-long associated transmission network for power evacuation and export to India.

Presently, SJVN is executing three hydro projects of 2,059 MW in Nepal. A 900 MW Arun-3 HEP is in advance stage of construction and 490 MW, Arun-4 HEP will be developed in joint venture mode by SJVN and Nepal Electricity Authority.

SJVN is targeting for 5,000 MW projects in Nepal by 2030.

PTI

Tags: Droupadi MurmuIndiaLower Arun Hydro Power projectNarendra ModiNepalPushpa Kamal DahalSatluj Jal Vidyut Nigam Ltd
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

Sarmistha Nayak

December 12, 2019
#MyPaperBagChallenge

Pratyasharani Ghibela

December 12, 2019
#MyPaperBagChallenge

Vandana Singh

December 12, 2019
#MyPaperBagChallenge

Tapaswini Mallick

December 12, 2019
#MyPaperBagChallenge

Adweeti Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Diptiranjan Biswal

December 12, 2019
#MyPaperBagChallenge

Aishwarya Ranjan Mohanty

December 12, 2019
#MyPaperBagChallenge

Tabish Maaz

December 12, 2019
#MyPaperBagChallenge

Faiza Firdous

December 12, 2019
#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Priyabrata Mohanty

December 12, 2019
#MyPaperBagChallenge

Archit Mohapatra

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
#MyPaperBagChallenge

Dibya Ranjan Das

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Sarfraz Ahmad

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Adrita Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Jhili Jena

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Keshab Chandra Rout

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019

Archives

Editorial

Rafale & Eiffel Misogyny

September 9, 2026

It is surprising that the administration in Paris, France, in charge of managing institutions like the Eiffel Tower bent over...

Read moreDetails

Judge Vs Judge

September 8, 2026

The judiciary is one of the three pillars of Indian democracy that the people traditionally trust, most for the redress...

Read moreDetails

Self Sabotage

Pic- ISRO
September 7, 2026

Research and Development (R&D) is always considered the most expensive or cost intensive part of any new product. Deep pockets...

Read moreDetails

Beyond 9/11

September 6, 2026

By Aakar Patel The 25th anniversary of the September 11 attacks will soon be upon us. Americans will mourn, taking...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST