Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

1.5 km Palghar tunnel breakthrough boosts India’s bullet train progress

IANS
Updated: January 2nd, 2026, 15:57 IST
in National
0
India’s bullet train progress

Pic-IANS

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

New Delhi: Railway Minister Ashwini Vaishnaw Friday virtually oversaw the key breakthrough of a 1.5-km-long tunnel of the bullet train project in Maharashtra’s Palghar district from Rail Bhawan in the national capital with chants of ‘Bharat Mata ki Jai!’

“The 1.5-km-long mountain tunnel is among the longest in Palghar district and is located between the Virar and Boisar stations on the bullet train route. It is the second tunnel breakthrough in Maharashtra, as the first 5-km-long underground tunnel between Thane and BKC was completed in September 2025,” according to a press statement issued by the Ministry of Railways.

Also Read

Airbus C295 military transport aircraft

India-made C-295 aircraft takes to skies for maiden flight

3 hours ago
Three Indians missing after vessel attacked off Oman; India condemns strike: MEA

Three Indians missing after vessel attacked off Oman; India condemns strike: MEA

16 hours ago

Vaishnaw said, “The bullet train achieves nearly 95 per cent carbon dioxide savings compared to highways. This is a significant point. Many countries have implemented bullet train projects purely for environmental reasons.”

“South Korea, for instance, has also gained major economic benefits from such projects. Alongside the economic advantages, the environmental benefits are equally substantial. The train reaches city centres directly, minimising disturbance to people and traffic. It passes through areas with high population density,” the minister explained.

Vaishnaw indicated Thursday that India is likely to receive its first Bullet Train August 15, 2027.

India’s first Bullet Train project spans 508 km between Mumbai and Ahmedabad. Of this, 352 km lies in Gujarat and Dadra and Nagar Haveli, and 156 km in Maharashtra.

According to the government, the corridor will connect major cities such as Ahmedabad, Vadodara, Bharuch, Surat, Vapi, Thane, and Mumbai, and is expected to cut travel time between the two metros to around two hours, significantly boosting inter-city mobility.

As per the National High-Speed Rail Corporation Ltd. (NHSRCL), over 85 per cent of the corridor, around 465 km, is being built on elevated viaducts, with 326 km already completed.

Vaishnaw on Friday said, “For spans longer than 40 meters, steel bridges are used because they are lighter and can support longer spans with greater strength. That’s why bridges with spans ranging from 40 meters up to almost 100-130 meters are all steel bridges.”

“The prime minister always emphasised learning new methods of working and setting new benchmarks for quality and technology. This project is a great example of that. Traffic cannot be stopped, trains cannot be halted,” he added.

In November 2025, Prime Minister Narendra Modi undertook a detailed review of the Mumbai-Ahmedabad High-Speed Rail (MAHSR) project during his visit to Gujarat, marking a key moment in India’s push towards next-generation transport infrastructure.

During the visit, the Prime Minister inspected the Surat station, a structure inspired by the city’s globally renowned diamond industry. With a height of 26.3 metres and a built-up area of 58,352 square metres, the station includes three levels: The ground floor for parking and security checks, the concourse level for lounges, restrooms, kiosks and ticketing, and the platform level for passenger boarding.

IANS 

Orissa POST – Odisha’s No.1 English Daily
Tags: Ashwini VaishnawMAHSRNHSRCL
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

Vandana Singh

December 12, 2019
#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Faiza Firdous

December 12, 2019
#MyPaperBagChallenge

Lopali Pattnaik

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Adrita Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

Jyotshna Mayee Pattnaik

December 12, 2019
#MyPaperBagChallenge

Manas Samanta

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019
#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
#MyPaperBagChallenge

Sarfraz Ahmad

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Adyasha Priyadarsani Sendha

December 12, 2019
#MyPaperBagChallenge

Pragyan Priyambada

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Mandakini Dakua

December 12, 2019
#MyPaperBagChallenge

Geetanjali Patro

December 12, 2019
#MyPaperBagChallenge

Sitakanta Mohanty

December 12, 2019
#MyPaperBagChallenge

Swarit Praharaj

December 12, 2019
#MyPaperBagChallenge

Archit Mohapatra

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019

Archives

Editorial

Two-Man Drama

Netanyahu to meet Trump
June 10, 2026

The renewed exchange of missiles between Israel and Iran through June 8-9 is ample evidence of instability continuing in the...

Read moreDetails

Deifying Dollar

Donald Trump
June 9, 2026

US President Donald Trump’s craving for long-lasting fame is well known. It assumed scandalous proportions while he was pursuing the...

Read moreDetails

Ethanol Agenda

June 8, 2026

On World Environment Day, 5 June, India launched E85, that is, petrol blended with 85 per cent ethanol at 48...

Read moreDetails

Longevity Vs Legacy

AAKAR PATEL
June 7, 2026

By Aakar Patel Friend Ram Madhav has written a fine piece on Prime Minister Narendra Modi reaching an important milestone....

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST