Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Ring-road project pushed into uncertainty

Post News Network
Updated: December 5th, 2023, 09:41 IST
in State, Top Stories
0
Representational image

Representational image

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

Sonepur: Construction of a portal frame bridge over the Mahanadi river to save Sonepur town from regular floods has run into rough water. Construction work on the bridge has been stopped halfway, sources said Monday. This town is regularly inundated with floodwaters from the Mahanadi and Tel rivers. The Odisha government undertook a plan to construct a ring road around this town with the bridge and the foundation stone for it was laid by Chief Minister Naveen Patnaik in 2011. The project was scheduled for completion by 2022.

However, there are no signs as to when it will finally see the light of the day. ARSS Infrastructure Projects Ltd was awarded the contract for the construction of the portal frame bridge. However, work has remained suspended for quite some time now. The agency has also informed the state government that it cannot work based on the old agreement as material costs have escalated. It has written a letter to superintendent engineer Damodar Kaibarta of the Works department urging him to cancel the old agreement and return the earnest money deposited. The bridge was scheduled for completion by 2022.

Also Read

Odia music director Abhijit Majumdar critically ill, admitted to AIIMS Bhubaneswar

Music director Abhijit Majumdar shifted back to ICU after health deteriorates

10 hours ago
Elephant tusks

Newborn rescued hours after being stolen from govt hospital, one arrested

11 hours ago

However, only 10 per cent of the project has been completed, sources said. The withdrawal of the agency from the project has sparked concern among the residents who constantly suffer due to floods. Sources said that the Water Resources department had constructed an embankment to protect the residents from floods as well as to address the burgeoning population and traffic problems in this town. It laid the soil embankment road for 1,500 metres from the Mahanadi bridge and also blacktopped 2,400 metres of road from Tel river bridge till Bada Bazar.

However, work on the portal frame bridge from Kumbharpada to Dasamati ghat is yet to be completed. The 1,150 metres long bridge is most vital component of the whole project. The Works department had floated tenders amounting to Rs 56.90 crore four years back for this purpose. The plan was to construct 45 pears and two abutments for the bridge. However, senior departmental officials delayed in submitting the designs for the pear points of the bridge.

Sources also informed that so far Rs 5 crore has been paid to the agency involved in construction work. District Collector Bimalendu Ray pulled up the agency after reports about the slow pace of work on the bridge appeared in media.

However, after that the agency stopped working completely on the project on the pretext of losses. Sitanshu Mishra, president of ‘Zilla Sachetan Nagarik Manch’ termed the disruption of work as ‘unfortunate’. “The agency went slow on the project after being selected. The Works department also neglected and took a lot of time in submitting the project designs due to which work has stopped,” he added.

Tags: MAHANADI RIVERPortal frame bridgering-road projectSonepur town
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Vandana Singh

December 12, 2019
#MyPaperBagChallenge

Mrutyunjaya Behera

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
#MyPaperBagChallenge

Adyasha Priyadarsani Sendha

December 12, 2019
#MyPaperBagChallenge

Chinmay Kumar Routray

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Adrita Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Sipra Mishra

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Jyotshna Mayee Pattnaik

December 12, 2019
#MyPaperBagChallenge

Akshaya Kumar Dash

December 12, 2019
#MyPaperBagChallenge

Adweeti Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Tabish Maaz

December 12, 2019
#MyPaperBagChallenge

Anasuya Sahoo

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Geetanjali Patro

December 12, 2019
#MyPaperBagChallenge

D Rama Rao

December 12, 2019
#MyPaperBagChallenge

Pratyasharani Ghibela

December 12, 2019
#MyPaperBagChallenge

Pitabas Tripathy

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019
#MyPaperBagChallenge

Pragyan Priyambada

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Archana Parida

December 12, 2019
#MyPaperBagChallenge

Keshab Chandra Rout

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Swarit Praharaj

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019

Archives

Editorial

Stalled Promise

October 12, 2025

Thirty five years ago, India chose to go down two paths, on both of which it remains. The first path...

Read moreDetails

Trade to Tirade

October 11, 2025

It started, as many big stories do these days, with a tweet. A blunt social media post by a mid-sized...

Read moreDetails

Military Rhetoric

General Upendra Dwivedi
October 8, 2025

I t is prudent for officials in high positions to speak with care and caution, for their words carry the...

Read moreDetails

Chinese H-1B

Pic- IANS
October 7, 2025

When US President Donald Trump’s administration in a new fiat, made the coveted H-1B visa available to foreigners at a...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST