Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Timeline extension, release of bank guarantee to boost liquidity in construction sector: ICRA

PTI
Updated: May 16th, 2020, 05:30 IST
in Business
0
realestate, PE, Investment, realty sector

File Photo

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

New Delhi:  Extension of up to six months in the timelines for work completion of highway projects and partial release of bank guarantees (BGs) will give a relief to construction firms and boost the developers’ ability to bid for new projects, rating agency ICRA Friday said.

Unveiling the first tranche of mega economic package Wednesday, Finance Minister Nirmala Sitharaman said all central agencies will provide an extension of up to 6 months to contactors without levying any additional cost or obligation on them for completion of work.

Also Read

Digi Yatra

Digi Yatra trials for international passengers begin at seven airports

13 hours ago
PFI in Indian equity market

FPIs pull out Rs 34,843 cr from equities in Oct; turn net buyers last week

17 hours ago

This extension will cover all central agencies like — Railways, Ministry of Road Transport and Highways, Central Public Works Department, etc.

Other measures for contractors include an extension of up to six months in the timelines for work completion, intermediate milestone, and extension of the concession period in the PPP contracts.

“ICRA expects the recent measures announced by the Finance Minister for the contractors – primarily extension of the timeline for project execution by up to six months, and a partial release of bank guarantees (BGs) – to provide some respite to the construction companies,” ICRA said in a statement.

It said partial release of BGs (to the extent contracts are complete) is a positive step and can help release some liquidity for contractors which is blocked in the margin money against these bank guarantees.

Shubham Jain, Senior Vice-President and Group Head, Corporate Ratings, ICRA, said “BGs play an essential role in the contract execution and a sizeable quantum of BGs are required by contractors, therefore non-availability of adequate BGs can constraint a contractor’s ability to bid for projects or efficiently execute projects.”    Over the last few years, the enhancement in the BG limits has remained challenging for many contractors and some had to avail of the BG against 100 per cent margin, thereby significantly blocking their capital, he said.

The provision of a partial release of the BGs can help reduce contractor’s overall requirement, and consequently enhance their ability to take up projects, Jain added.

Typically, a construction company requires BGs equivalent to 15-20 per cent of its contract value. These are in the form of performance bank guarantees, a guarantee for availing of the mobilisation advance, a guarantee for release of the retention money, earnest money guarantee, etc.

Generally, for issuing the BGs, banks keep a margin money of 10-20 per ceny, and additional collateral security. Thus, for a construction company, sizeable funds get blocked as margin money against the BGs.

As per a study conducted by ICRA on a sample of its rated entities, the margin money blocked against the BGs was 24 per cent of the aggregate net worth.

Depending on the stage of the order execution, the partial release of the BG can have a significant positive impact on the liquidity of construction companies, it said adding, for the sample set, a release of 10 per cent of the BGs could boost their liquidity by 14 per cent from the current levels by freeing up the margin money.

The impact could be much higher for companies which, in the absence of adequate BG limits, had to avail of the BGs against a 100 per cent margin, it said.

Jain added: “The total outstanding bank guarantees for construction and infrastructure sectors is estimated to be in the range of Rs 4 to 5 lakh crore. A release of 5 per cent of these guarantees can provide contractors a liquidity of Rs 2000-3000 crore and increase their ability to take up new projects worth Rs 2 lakh crore.”

On the flip side, while this is a positive, there will be operational challenges in getting the partial release of the BGs as in most cases the existing BG issued must have been in a single tranche, ICRA said adding, hence, for availing a partial release a new BG of a lower amount will need to be provided, post which the existing BGs can be returned.

Besides the BG release, other measures for contractors include an extension of up to six months in the timelines for work completion, intermediate milestone, and extension of the concession period in the PPP contracts.

This will provide some respite to contractors who have suffered loss of execution time during the lockdown and likely to see moderation in execution in the near term due to labour and raw material constraints, the statement said.

It said the loss of revenue for contractors on account of lockdown and gradual ramp-up is expected to have a significant impact on their scale and cash generation ability.

(PTI) 

Tags: constructionICRALiquidityNirmala Sitharamanreal estate
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Mrutyunjaya Behera

December 12, 2019
#MyPaperBagChallenge

Archana Parida

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Manas Samanta

December 12, 2019
#MyPaperBagChallenge

Rajashree Manasa Mohanty

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019
#MyPaperBagChallenge

Arya Ayushman

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Adrita Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Pratyasharani Ghibela

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Surya Sidhant Rath

December 12, 2019
#MyPaperBagChallenge

Pragyan Priyambada

December 12, 2019
#MyPaperBagChallenge

Ankita Balabantray

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Lopali Pattnaik

December 12, 2019
#MyPaperBagChallenge

D Rama Rao

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Vandana Singh

December 12, 2019
#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Sarmistha Nayak

December 12, 2019
#MyPaperBagChallenge

Parbati Mohanty

December 12, 2019
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
#MyPaperBagChallenge

Dibya Ranjan Das

December 12, 2019
#MyPaperBagChallenge

Matrumangal Jena

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019
#MyPaperBagChallenge

Kamana Singh

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Debasis Mohanty

December 12, 2019
#MyPaperBagChallenge

Jhili Jena

December 12, 2019
#MyPaperBagChallenge

Sitakanta Mohanty

December 12, 2019

Archives

Editorial

The Secular Facade

AAKAR PATEL - The AI Race
November 1, 2026

By Aakar Patel My thesis is that the Indian state under Hindutva is incompletely communal. I have written about this...

Read moreDetails

The Extension Culture

Dilip Cherian
October 31, 2026

By Dilip Cherian The litany of extensions continues. The latest is Defence Secretary Rajesh Kumar Singh, whose tenure the Modi...

Read moreDetails

Youth Power

Youth Power
October 28, 2026

The angry young generation is rising in protest in India, France, Spain, Italy, Germany, Poland and Serbia, to name a...

Read moreDetails

Left In Brazil

Luiz Inacio Lula da Silva
October 27, 2026

Brazil has come as a surprise at a time when extreme Right parties in Europe, Latin America and elsewhere, helped...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2025 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2025 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2025 All rights Reserved by OrissaPOST