Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Uttarkashi tunnel collapse: Vertical hole, new road planned to reach 41 workers trapped

PTI
Updated: November 18th, 2023, 20:17 IST
in National, Prime News
0
Uttarkashi tunnel collapse

Image: topindiannews_/Twitter

Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

Uttarkashi (Uttarakhand):  With time running out, officials Saturday began preparations to drill a vertical hole from the top of the hill under which 41 workers have been trapped inside a collapsed tunnel for seven days with limited food and communication.

As the sun slipped behind the mountains and night fell on another day gone by, officials held out the hope that the Border Roads Organisations (BRO) road to create an alternative route to the under-construction Silkyara tunnel would be ready by Sunday afternoon and the rescue mission that had been stalled since Friday could finally resume.

Also Read

Pic- PTI

Indo-Pak tension: Pitch-black night, wail of sirens keep locals on western front awake in fear

7 hours ago
Pakistan’s aerial attack foiled by Indian air defence amid blackouts and sirens, retaliatory measures launched

Pak drones sighted at 26 places; armed drone injure members of family in Ferozpur

7 hours ago

“We are trying to make a vertical track from the top of the tunnel. A point at the top of the tunnel has been identified from where drilling will start soon. This track is about 1,000-1,100 metres long. Simultaneously, we are also conducting a survey to know how much time it will take. As per our calculations, the track should be ready by tomorrow afternoon,” BRO’s Major Naman Narula told reporters.

A high-performance drilling machine was brought here from Indore Saturday to pierce through the rubble of the collapsed tunnel on the Char Dham route and was being assembled before it is deployed to resume drilling, officials at the site said.

The Silkyara tunnel, about 30 km from the district headquarters of Uttarkashi and a seven hour drive from the Uttarakhand capital Dehradun, is part of the ambitious Char Dham all-weather road project of the Central government. It is being constructed under the National Highways & Infrastructure Development Corporation Limited (NHIDCL).

The tunnel collapsed around 5.30 am last Sunday. One week on, as the hours ticked by, the desperation of families waiting outside mounted. That rescue operations  had been suspended since Friday afternoon when a US-made auger machine deployed to drill and push in pipes through the rubble to prepare an escape passage for the workers developed a snag exacerbated the anxiety.

By the time the drilling was halted, the auger machine had drilled up to 24 metres through the rubble spread over a 60-metre area inside the tunnel.

While families back home and those gathered at the mouth of the tunnel counted the hours, officials waged their own frantic battle against time as they weighed the various options available to them.

“One option is to make a four-six inch long hole which will help in providing essential items to the trapped people. If the conditions are favourable, a three-feet diameter hole will also be made so people will be able to come out. This road is about 900 metres long. Hopefully, the road will be ready by tomorrow morning,” said RS Rao of the Directorate General Border Roads (DGBR).

Four machines have been currently put to work right now and four more are arriving, he added.

Other officials and experts gathered at the site too to figure a way out of the crisis and save the 41 men counting the hours inside the dark tunnel.

“We have come here to assess what options are available with us, to explore what possibilities are there that can help rescuers reach the trapped workers as soon as possible. We are discussing all options, including vertical and sideways drilling to evacuate them,” Bhaskar Khulbe, former advisor to the prime minister and now OSD in the Uttarakhand government, told reporters in Silkyara.

He was part of a team, including secretary of the Ministry of Road Transport and Highways Mahmood Ahmed, Deputy Secretary, PMO, Mangesh Ghildiyal,  geologist Varun Adhikari and engineering expert Armando Capellan.

Asked about the rescue work suspended at the tunnel for so long, Khulbe said it was time to look ahead. “We should think of what we can do now. Time is not appropriate to discuss what happened in the past.”

Chief Minister Pushkar Singh Dhami held a meeting with officials at his official residence in Dehradun for an update on the crisis. He expressed the hope that  the state-of-the-art machines manufactured in the country and abroad will be successful in rescuing the labourers.

“Under the guidance of the PMO, the state government is busy making all efforts to evacuate labourers trapped inside the tunnel are rescued. We hope we will soon succeed in the mission,” he said.

Notwithstanding government assurances, it was an agonising wait for the families keeping vigil outside, despairing as the hours and days rolled on inexorably.

Their voices are getting weaker, their strength seemingly dimming, family members said after speaking to some of the workers.

Among those waiting was the family of Gabbar Singh Negi. His two brothers, Maharaj Singh and Prem Singh, and son Akash Singh have been camping outside, desperate for any sliver of news that comes their way. The family belongs to Kotdwar in the state.

Maharaj said he spoke to Gabbar through a pipe used for supplying oxygen and his voice sounded very feeble.

“I could not talk to my brother. His voice sounded very weak. He was hardly audible. Rescue work in the tunnel has come to a halt. Those trapped are also short of food and water. We have come to the end of our patience. What more can I say?” Maharaj told PTI.

Their brother Prem said the trapped workers are beginning to lose hope.

“Gabbar said he is alright but his voice is feebler now. They are getting light edibles like chana, kheer and badam. How long can they sustain on this?” Prem asked.

“India has gone digital. They talk about the success of India’s Chandrayan mission but they cannot evacuate our people trapped for around a week.”

The health condition of the men is worsening and his family back home getting increasingly panicky, added Haridwar Sharma, whose younger brother Sushil is among those inside the tunnel.

“All we are getting are assurances from authorities that the trapped labourers will be rescued. It has been nearly a week,” Sharma, who is from Bihar’s Rohtas district, told PTI.

“There is no work going on inside the tunnel. Neither the company nor the government is doing anything,” he added tearfully.

Rescue operations stalled around 2.45pm Friday. During the positioning of a fifth pipe, a big cracking sound was heard in the tunnel  upon which rescue operation was suspended immediately, a statement from the NHIDCL tasked with the construction of the tunnelsaid in a statement Friday night.

The sound created panic among the rescue team. An expert involved with the project warned about the possibility of further collapse in the vicinity. Subsequently, the pipe pushing activity was stopped.

The number of workers inside has been revised from 40 to 41. The NHIDCL, which is constructing the tunnel through Navayuga Engineering Company Ltd, came to know about this discrepancy Friday.

Deepak Kumar from Muzaffarpur district in Bihar was identified as the 41st person to be stuck in the tunnel.

PTI

Tags: UttarakhandUttarkashi
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Archana Parida

December 12, 2019
#MyPaperBagChallenge

Tapaswini Mallick

December 12, 2019
#MyPaperBagChallenge

Swarit Praharaj

December 12, 2019
#MyPaperBagChallenge

Akshaya Kumar Dash

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019
#MyPaperBagChallenge

Anasuya Sahoo

December 12, 2019
#MyPaperBagChallenge

Tabish Maaz

December 12, 2019
#MyPaperBagChallenge

Pragyan Priyambada

December 12, 2019
#MyPaperBagChallenge

Sisirkumar Maharana

December 12, 2019
#MyPaperBagChallenge

D Rama Rao

December 12, 2019
#MyPaperBagChallenge

Matrumangal Jena

December 12, 2019
#MyPaperBagChallenge

Rajashree Manasa Mohanty

December 12, 2019
#MyPaperBagChallenge

Ipsita

December 12, 2019
#MyPaperBagChallenge

Sibarama Khotei

December 12, 2019
#MyPaperBagChallenge

Bijswajit Pradhan

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Akriti Negi

December 12, 2019
#MyPaperBagChallenge

Spinoj Pattnaik

December 12, 2019
#MyPaperBagChallenge

Adweeti Bhattacharya

December 12, 2019
#MyPaperBagChallenge

Shreyanshu Bal

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar

December 12, 2019
#MyPaperBagChallenge

Subhajyoti Mohanty

December 12, 2019
#MyPaperBagChallenge

Narendra Kumar

December 12, 2019
#MyPaperBagChallenge

Smitarani Sahoo

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Pitabas Tripathy

December 12, 2019
#MyPaperBagChallenge

Sarmistha Nayak

December 12, 2019
#MyPaperBagChallenge

Anup Mahapatra

December 12, 2019

Archives

Editorial

German Challenge

Germany flag
May 7, 2025

With the assumption of office by Christian Democratic Union (CDU) leader Friedrich Merz as Chancellor of Germany 6 May, Europe’s...

Read more

(Anti)-Trump Card 

Trump
May 6, 2025

First it was Canada, and now Australia and Singapore: the anti-Trump factor appears to be benefiting parties that are perceived...

Read more

Mandal-Kamandal 2.0

Caste census
May 5, 2025

The decision taken at a meeting of the Cabinet Committee on Political Affairs (CCPA), headed by Prime Minister Narendra Modi...

Read more

Hyphen in Geopolitics

Aakar Patel
May 4, 2025

Through the 1990s and up until fairly recently, India insisted on something called de-hyphenation. The hyphen referred to was the...

Read more
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2024 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2024 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2024 All rights Reserved by OrissaPOST